SYSTRA to Advise on Construction of Copenhagen M4 Extension Yurtdışı Haberleri by railsistem - Şubat 10, 20260 SYSTRA Denmark has been awarded a new contract for Copenhagen metro operator Metroselskabet’s M4 line. To date, SYSTRA has been involved in the construction of all metro lines built in the Danish capital. SYSTRA will act in an advisory role during the line’s extension © SYSTRA Metro line M4 is set to be extended
MPs Seek Clarity on Rail Reforms and Political Control of Great British Railways Yurtdışı Haberleri by railsistem - Şubat 10, 20260 Members of Parliament have called on the UK Government to provide clearer details on its rail reform plans and to limit the risk of political micromanagement under the proposed Great British Railways (GBR) body. The House of Commons Transport Committee has published two reports following its inquiries into the Railways Bill
UK Officially Lowers Minimum Train Driver Age to 18 Yurtdışı Haberleri by railsistem - Şubat 10, 20260 The Government has announced that from 30 June 2026, the minimum age to become a train driver will be lowered from 20 to 18 years old. The move is hoped to address ongoing concerns that the number of train drivers in the country is slowly declining, as a quarter of all
Northern Launches New Yorkshire Flyer Service Between Leeds and Sheffield Yurtdışı Haberleri by railsistem - Şubat 10, 20260 Northern has launched a new service that aims to connect the White Rose cities of Leeds and Sheffield in 47 minutes – the Yorkshire Flyer. Launched during an event at Leeds station; the Yorkshire Flyer will also add over 30,000 extra seats a week, accommodating projected growth along the railway. The new
Stadler to Supply 35 EURO4001 Locomotives for Turkish Operation Yurtdışı Haberleri by railsistem - Şubat 9, 20260 Stadler has announced receipt of a contract from the Turkish railways company TCDD Taşımacılık A.Ş. to design, manufacture and deliver 35 EURO4001 diesel-electric mainline locomotives. The contract, which also includes the provision of capital spares, spares, consumables, special tools and test equipment, will also see Stadler commit to three years of
Canada: Hyundai Rotem to Supply High-Floor Light Rail Vehicles in Edmonton Yurtdışı Haberleri by railsistem - Şubat 9, 20260 The City of Edmonton has signed a purchase contract with Hyundai Rotem Company for a new fleet of high-floor light rail vehicles to support planned network expansions and replace ageing rolling stock. The agreement covers the design and manufacture of 32 high-floor vehicles for use on the Metro Line Northwest Phase
Amtrak Public Meeting Outlines Strong Performance and 2026 Priorities Yurtdışı Haberleri by railsistem - Şubat 9, 20260 Last week, Amtrak’s Board of Directors held a public meeting, providing an in-depth overview of the company’s financial and operational performance, as well as outlining strategic priorities for 2026. The session also featured updates on major infrastructure projects aimed at modernising the passenger experience and enhancing the national rail network. Amtrak’s Sunset
Alto Responds to Public Questions on Canada’s High-Speed Rail Project Yurtdışı Haberleri by railsistem - Şubat 9, 20260 Alto has published responses to common questions raised during its January public consultation process for Canada’s proposed high-speed rail network between Québec City and Toronto. The consultation included virtual sessions, roundtable discussions, and in-person open houses along the proposed corridor. It aimed to gather feedback on potential benefits, environmental considerations, and
Land Acquisition Process Begins for DART+ South West Yurtdışı Haberleri by railsistem - Şubat 9, 20260 Work has now officially begun on the formal land acquisition process for a set of 750 directly impacted landowners along Ireland’s DART+ South West route. All landowners have been issued with a Notice to Treat – a statutory step that formally initiates the land purchase process and confirms CIÉ’s intention to
Talgo to Supply & Maintain 20 High-Speed Trains for Saudi Arabia Railways Yurtdışı Haberleri by railsistem - Şubat 9, 20260 Talgo has been awarded a new contract to both manufacture and maintain a set of 20 new high-speed trains for Saudi Arabia Railways (SAR). The contract, which will add 1.3 billion EUR to Talgo’s order book, will see the new units enter operation on the rail line connecting Mecca, Medina and
Deutsche Bahn Begins Major Rail Corridor Renovations Yurtdışı Haberleri by railsistem - Şubat 9, 20260 DB InfraGO has begun two major rail corridor renovation projects in North Rhine-Westphalia and Bavaria, commencing extensive infrastructure works on the Hagen–Wuppertal–Cologne and Nuremberg–Regensburg lines. Both schemes involve full route closures, diversions for long-distance and freight trains, and large-scale replacement bus services for regional passengers. DB InfraGO begins the renovation of the
From the Last Storm to Planning for the Next: A Proactive Approach to Cable Network Resilience Yurtdışı Haberleri by railsistem - Şubat 6, 20260 January’s heavy snowfall across parts of Scotland brought the age-old winter challenges for rail and power infrastructure teams. But if recent weather patterns tell us anything, it’s that the real test isn’t just the snow itself — it’s what comes after. Extreme weather events are becoming more frequent and less predictable, and
Transmission Dynamics strengthens global rail presence with PANDAS-V® deployments in São Paulo Yurtdışı Haberleri by railsistem - Şubat 6, 20260 Transmission Dynamics, in partnership with Motiva Trilhos, has delivered the first deployment of its PANDAS-V® overhead line monitoring system in Brazil, supporting ViaMobilidade Lines 8-Diamante and 9-Esmeralda in São Paulo. PANDAS-V® is the first AI-driven overhead line monitoring solution of its kind to be deployed in Brazil. The system provides automated reports, instant
North Carolina: Salisbury to Asheville Rail Line Promises $1 Billion Economic Boost Yurtdışı Haberleri by railsistem - Şubat 6, 20260 A proposed passenger rail corridor linking Salisbury and Asheville would generate thousands of jobs and hundreds of millions of dollars in economic activity if developed, according to a new study by the North Carolina Department of Transportation (NCDOT) Rail Division. The Western North Carolina Rail Corridor Economic Impact Report examines the
US: Congress Pledges $94 Million Toward Mobility Projects for 2028 Olympic & Paralympic Games Yurtdışı Haberleri by railsistem - Şubat 6, 20260 The Los Angeles County Metropolitan Transportation Authority (LA Metro) has applauded Congress for pledging 94.3 million USD worth of funding toward mobility related projects for the 2028 Olympic and Paralympic Games in the recently enacted transportation spending law. Part of a broader bill that seeks to provide federal investment for public
New Tram-Trains Enter Final Phase of Testing Before Welsh Operation Yurtdışı Haberleri by railsistem - Şubat 6, 20260 A fleet of 36 new Class 398 Tram-Trains are currently undergoing their final testing phase before entering passenger service in Wales. The vehicles, which are set to revolutionise transport in South Wales, are set to begin operating on a number of the Core Valleys Lines this coming Spring. The new tram-trains will
HS2: Porous Portals Completed on Northern End of Chiltern Tunnel Yurtdışı Haberleri by railsistem - Şubat 6, 20260 HS2 has announced the completion of construction work on two large portal extensions at the northern end of the tunnel beneath the Chiltern Hills. The structures, which are known as porous portals, have been engineered to eliminate the possibility of trains creating a sonic boom when they enter the tunnel at
Siemens and Stadler to Supply Automated Train Fleet for Copenhagen S-Bane Yurtdışı Haberleri by railsistem - Şubat 6, 20260 Siemens Mobility and Stadler have signed a framework agreement with Danish State Railways (DSB) to supply a new fleet of fully automated trains for Copenhagen’s S-Bane suburban rail network. The contract covers 226 four-car trainsets, with an option for up to 100 additional units, and has a total value of around
5 Questions to Ask When Choosing a Stainless Steel Hinge Yurtdışı Haberleri by railsistem - Şubat 6, 20260 Good design frequently goes unnoticed. This is because, firstly, a well-functioning product naturally receives less recognition than a product with flawed operation and, secondly, the design details that constitute a high-quality product are often not obvious to an end user. This observation is certainly true for many hardware components: while playing
California High Speed Rail Moves Towards Track Laying Phase Yurtdışı Haberleri by railsistem - Şubat 5, 20260 Governor Gavin Newsom has announced the completion of a key logistics facility for California’s high-speed rail project, enabling the next phase of construction to begin with the installation of track and systems. The Southern Railhead Facility, located near Wasco in Kern County, has been completed after a year of construction. The
Mersen: Sales of €1.2 billion in 2025, in Line with Expectations Yurtdışı Haberleri by railsistem - Şubat 5, 20260 Mersen, a global expert in electrical power and advanced materials, has reported consolidated sales of €1,186 million for full-year 2025, down 3.2% on an organic basis. Sales of €1,186 million for full-year 2025, down 3.2% on an organic basis compared to 2024 Fourth-quarter 2025 sales virtually stable year-on-year on an organic basis
CAF to Manufacture Nine Extra-Long Trams for Operaton in Vitoria Yurtdışı Haberleri by railsistem - Şubat 5, 20260 CAF has announced the successful conclusion of a contract to manufacture nine extra-long tram units for the Zabalgana line in Vitoria. Representing an investment of almost 49 million EUR; the units are scheduled for delivery between 2028 and 2029. The new trams will measure in at 44 metres in length © CAF Each unit
TTC Announces Introductory Service Period for Line 5 Eglinton Yurtdışı Haberleri by railsistem - Şubat 5, 20260 The Toronto Transit Commission (TTC) has announced an introductory service period for Line 5 Eglinton, beginning this Sunday (8 February). The period marks the final step toward a full line launch, which will see regularly scheduled service one it demonstrates a degree of both reliability and performance deemed satisfactory to the
San Francisco Bay Area Transit Avoids Service Cuts with $590m State Loan Yurtdışı Haberleri by railsistem - Şubat 5, 20260 An agreement has been reached between the Office of Governor Gavin Newsom, the California Department of Finance and the Metropolitan Transportation Commission (MTC) on a 590 million USD loan package for major Bay Area transit agencies. The funding is intended to prevent planned service reductions across several networks during the 2026–27
Stadler Announces Major Changes to Board of Directors Yurtdışı Haberleri by railsistem - Şubat 5, 20260 Stadler has announced major changes within its Board of Directors, with long-standing members Christoph Franz and Wojciech Kostrzewa opting not to stand for re-election. As a result, this year’s Stadler Annual General Meeting on 5 May 2026 will see the election of two new members in Sabrina Soussan and Michael Schöllhorn. An
TSSA Demands Full Explanation for London Rail Disruption Yurtdışı Haberleri by railsistem - Şubat 5, 20260 Rail union TSSA has stated that there must be a full and proper explanation given for the major rail disruption during Wednesday’s rush hour both into and across London. The disruption affected Express, Southern and Govia Thameslink services, and was accompanied by a rare ‘do not travel’ warning, which remained in
Olaf de Kok the New Managing Director of Althen Sensors & Controls Yurtdışı Haberleri by railsistem - Şubat 5, 20260 We are proud to announce that Olaf de Kok, currently Sales Director at Althen Sensors & Controls, is the new Managing Director in the Netherlands. Rely on the full Althen experience In his first Althen year Olaf has played an important role in strengthening customer relationships and supporting the growth of our sales organisation. But
Cloud-based Monitoring Solutions for Reliable and Efficient Railways Yurtdışı Haberleri by railsistem - Şubat 5, 20260 The intelligent use of data offers significant potential for railway operations. By adopting modern, cloud-based monitoring solutions, operators can shift from reactive maintenance to predictive strategies, addressing issues before they affect service. This helps to improve system availability, efficiency, and overall maintenance outcomes. At the same time, operators must meet
Using Maps to Understand How Rail Assets Change Over Time Yurtdışı Haberleri by railsistem - Şubat 5, 20260 Planning teams are usually asked to explain not just what work they want to do, but how it will reshape the network over the next few years. Yet most tools still only show a static picture. Asset registers sit in one place, planned interventions in another and maps show today’s
Nokia and ST Engineering Partner to Deploy Railway Communications Network Yurtdışı Haberleri by railsistem - Şubat 5, 20260 Nokia today announced that it has collaborated with ST Engineering and First One Systems to deploy an IP/MPLS-based mission-critical Backbone Transmission Network (BTN) for the new Mass Rapid Transit (MRT) Orange Line of Bangkok Expressway and Metro Public Company Limited (BEM). The project is expected to be completed by 2030. When
Scaling Wayside Electronics: What it Takes to Manage AEI at the Network Level Yurtdışı Haberleri by railsistem - Şubat 5, 20260 The Limits of Single-Site Thinking In the initial stages of implementing rail technology, many Automatic Equipment Identification (AEI) and wayside electronics systems were designed and deployed as standalone installations. These “islands of technology” served specific local purposes, such as tracking arrivals at a particular yard or monitoring equipment at a high-traffic
Wabtec to Modernise Union Pacific Locomotives in $1.2 Billion Agreement Yurtdışı Haberleri by railsistem - Şubat 4, 20260 Union Pacific and Wabtec have signed a landmark agreement that will see a total modernisation of the former’s AC4400 locomotives. The contract, worth 1.2 billion USD, represents the largest locomotive modernisation investment in rail industry history, and builds on Union Pacific’s 2022 order – which is set for completion in 2026. The
Gateway Development Commission Sues Federal Government Over Hudson Tunnel Funding Yurtdışı Haberleri by railsistem - Şubat 4, 20260 The Gateway Development Commission (GDC) has filed a breach of contract claim against the United States federal government in the U.S. Court of Federal Claims, seeking the release of grant and loan funding for the Hudson Tunnel Project (HTP). GDC warned that if additional federal funding is not made available by
California’s $1 Billion Transport Funding Package Includes Rail Investment Yurtdışı Haberleri by railsistem - Şubat 4, 20260 The California Transportation Commission (CTC) has approved a transport funding package worth nearly 1 billion USD, with a portion directed towards rail and public transport schemes. The 988.7 million USD allocation forms part of the state government’s Build More, Faster – For All infrastructure agenda and combines 184 million USD from
Lumo Enhances Accessibility Aid with Virtual Tour Updates Yurtdışı Haberleri by railsistem - Şubat 4, 20260 Lumo has announced a number of enhancements to its virtual tour digital tool, which aims to provide reassurance for customers eager to explore the train’s accessibility features before their day of travel. The tool, which is available on the open access operator’s website, was developed with Ocean 3D, which Lumo arranged
Beyond Human Vision: Why Radar and AI Are Critical for Mainline, Passenger and Freight Safety and Operational Efficiency Yurtdışı Haberleri by railsistem - Şubat 4, 20260 As operators push for higher safety, efficiency, and automation, radar-powered systems and AI are reshaping long-range perception in rail, enabling trains to ‘see’ beyond human and camera-based vision. Vicky Alman, CEO of NIART Systems, explores how these technologies enable trains to ‘see’ beyond the limits of human and camera-based vision. Rail
No wiring – no development – no risk! Yurtdışı Haberleri by railsistem - Şubat 4, 20260 Simply plug in and screw down. That’s how easy it is to install the new 50 W DC/DC converter from intreXis. Eliminating cables reduces installation effort and lowers total system costs. 50-Watt DC-DC Converter PCB-MOUNT © intreXis AG No additional components are required, and the converter is 100% EN 50155 compliant. This means
Alstom Signs New Contract with PLK SA for Point Machine Maintenance Yurtdışı Haberleri by railsistem - Şubat 4, 20260 Alstom has signed a new, four-year agreement with PKP Polskie Linie Kolejowe S.A. for ongoing inspections and overhauls of Onvia Switch electric point machines used across the Polish network. Active between 2026 and 2029; the main scope of the contract covers almost 3,500 inspections and overhauls, with an option for an
Construction Nears Completion on Ontario’s Northlander Rail Line Yurtdışı Haberleri by railsistem - Şubat 3, 20260 The Ontario government has announced that construction is almost complete on the Northlander rail line, following over 100 million CAD in investments. The project supports the return of Northlander passenger rail service to northeastern Ontario later this year. A rendering of the new Northlander trainset © Ontario Government Construction is underway along the rail
Amtrak Advises Passengers Book Early to Avoid Disappointment this Summer Yurtdışı Haberleri by railsistem - Şubat 3, 20260 Amtrak has advised passengers to book early to avoid disappointment this summer as North America anticipates the beginning of the FIFA World Cup 2026. The season is expected to be one of the busiest periods in the company’s history, and customers are recommended to secure their seats now. Amtrak has advised customers
Denver International Airport Receives Final Alstom Train Car for Modernised Fleet Yurtdışı Haberleri by railsistem - Şubat 3, 20260 Denver International Airport (DEN) has received the final Innovia APM R train car in the modernisation of its Automated Guideway Transit System (AGTS) fleet. The modernisation has been valued at 78.85 million USD, with the entire system and vehicle fleet seeing its first modernisation effort since its original construction in 1995. DEN
Indian Railways Plans Record Investment in High-Speed Rail Yurtdışı Haberleri by railsistem - Şubat 3, 20260 Indian Railways will receive a record capital expenditure of 2,93,030 crore INR (35.3 billion USD) in the Union Budget 2026–27, focusing on high-speed rail, freight efficiency, and passenger safety. This investment will establish seven new high-speed rail corridors spanning nearly 4,000 kilometres and connecting major cities including Mumbai, Pune, Hyderabad, Bengaluru,
Melbourne Welcomes Big Switch on Metro Tunnel Yurtdışı Haberleri by railsistem - Şubat 3, 20260 Melbourne’s Metro Tunnel has officially welcomed its first peak hour commuters, with the Big Switch now having turned on extra services for the dedicated Cranbourne, Pakenham and Sunbury lines. Thus far; more than 800,000 passengers have visited the new stations, and trains have travelled over 64,000 kilometres through the tunnel since
Northern Seeks Engineering Apprentices in Recruitment Drive Yurtdışı Haberleri by railsistem - Şubat 3, 20260 Northern has announced the beginning of a new recruitment drive as it seeks up to 18 apprentices ready to develop both mechanical and electrical engineering skills. The operator is offering three-year apprenticeships involving classroom learning and formal on-the-job training, which will then lead to the receipt of a nationally recognised Level
Stadler’s TINA Tram Modifications Reduce Vibrations in Darmstadt Yurtdışı Haberleri by railsistem - Şubat 3, 20260 Stadler has released results from recent technical modifications and measurement runs on the TINA tram in Darmstadt, demonstrating that changes to the vehicle’s running gear have led to a measurable reduction in vibrations during operation. At the measurement point that previously recorded the highest values, the assessed vibration level was reduced
IN PICTURES: LNER Unveils New Class 897 ‘Serenza’ Trains Yurtdışı Haberleri by railsistem - Şubat 2, 20260 LNER has provided a first look at its brand-new fleet of 10 intercity trains, which officially carries the name Serenza. The new trains, which have been built by CAF and financed by Porterbrook, will be introduced in order to accommodate growing rail travel demands along the East Coast Main Line. Inside the
Parsons Awarded Design & Engineering Contract for Foothill Gold Line Claremont Extension Yurtdışı Haberleri by railsistem - Şubat 2, 20260 The board of directors for the Foothill Gold Line Construction Authority have voted unanimously to award the design and engineering services contract for the Claremont Extension of the Metro A Line light rail system to the engineering firm of Parsons Transportation Group, Inc. A decision was made following a lengthy and
Rome’s Metro Line C Extension to Be Built Under €776 Million Contract Yurtdışı Haberleri by railsistem - Şubat 2, 20260 The Metro C Consortium, led by Webuild with Vianini Lavori, has been awarded a 776 million EUR contract to design and build the T1 section of Rome’s Metro Line C extension. The T1 section will connect the Clodio/Mazzini and Farnesina stations in the northern part of the city, extending public transport
RailTel Collaborates with Nokia to Modernize its Transport Networks Across India Yurtdışı Haberleri by railsistem - Şubat 2, 20260 Nokia today announced the successful upgrade of RailTel’s DWDM National Long-Distance (NLD) network, undertaken in collaboration with its authorized partners. Nokia has deployed RailTel’s Carrier-Grade NAT (CG-NAT) and metro optical transport network across India. These initiatives collectively address the growing demand for high-speed, resilient connectivity, driving operational efficiency and reducing
SYSTRA Secures Contract for Taiwan’s High-Speed Rail Upgrade Yurtdışı Haberleri by railsistem - Şubat 2, 20260 SYSTRA has been awarded a contract for the modernisation of Taiwan’s high-speed rail fleet, through a collaboration with Mitsubishi Heavy Industries (MHI). Under the agreement, SYSTRA will carry out the independent safety assessment (ISA) of upgraded on-board automatic train control (ATC) systems installed on high-speed trainsets. The work forms part of a
BLT Launches Partially Automated Services Along Waldenburg Railway Yurtdışı Haberleri by railsistem - Şubat 2, 20260 BLT Baselland Transport AG has become the very-first Swiss railway company to begin operating partially automated GoA2 services along the Waldenburg Railway. The transition has been made possible due to the installation of modern signalling technology from Stadler, and was approved by the Swiss Federal Office of Transport (FOT). The line is
Beyond the Paycheck: Crafting a Winning Executive Value Proposition (EVP) in 2026 Yurtdışı Haberleri by railsistem - Şubat 2, 20260 Today’s companies realize the value of good talent, especially in executive hires. The right talent can increase profitability, boost efficiency, and even establish your company as an industry disruptor. The question is, how can your company attract executive talent that brings you closer to your goals? The right executive value
New Hardware Page Live at cn-mobility Yurtdışı Haberleri by railsistem - Şubat 2, 20260 We have launched a new hardware page on our website, making our products more visible and easier to access – from a clear overview down to simplified data sheet level. Simplified data sheets are deliberately available without download barriers No forms, no detours – ideal for technical audiences, sales teams, trade fairs
Train Interior Components Yurtdışı Haberleri by railsistem - Şubat 2, 20260 Passenger train interiors incorporate a range of essential components, including armrests, partitions, wall panels and safety signs. These products play a critical role in enhancing passenger safety and functionality, while being engineered to meet the rail industry’s strict durability and fire-safety requirements. Did you know? INPS is actively involved in the
One cut. One minute. Zero compromise. Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Speed, precision and flexibility are critical when it comes to modern rail maintenance – especially in challenging environments such as tunnels or dense urban areas. The battery-powered ROCUT E3 sets new standards in rail cutting performance and proves that maximum power no longer requires cables or fuel. The ROCUT E3 is
Icomera Welcomes Cyril Morette as Sales Manager, Media Content Solutions Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Icomera is pleased to welcome Cyril Morette as our new Sales Manager, Media Content Solutions, joining the Global Business team from our Paris office. With nearly 20 years in the media industry, Cyril brings extensive experience from major entertainment and digital content creator economy, including Warner Brothers, 20th Century Fox, and Jellysmack. His career has centred on strategy, partnerships, and digital content distribution
Northern to Run First-Ever Charity Service Along Heritage Line Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Northern has announced the running of a service along the Darlington line to raise money for charity on Sunday 22 February. The occasion marks the first time the operator has run a service along a heritage rail line, with tickets on sale for the service, which will set off from Darlington
Pandrol Announces SNCF Réseau Approval for its Under Sleeper Pads Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Pandrol, a leading manufacturer of railway infrastructure solutions, is pleased to announce that its USP (Under-Sleeper Pads) have been approved by SNCF Réseau, the French railway infrastructure manager and subsidiary of the public group SNCF. This success demonstrates that Pandrol’s USPs meet the strict operating requirements for the French rail network.
US: Hudson Tunnel Construction to Pause Without Restored Federal Funding Yurtdışı Haberleri by railsistem - Ocak 30, 20260 The Gateway Development Commission (GDC) has said construction of the Hudson Tunnel Project will be paused if federal funding disbursements do not resume in the coming days. The company has informed contractors that funds for current construction will be exhausted by 6 February. Contractors will spend the next two weeks winding
Stäubli Expands Manufacturing Facility in Bangalore Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Bangalore, India – Stäubli, the global industrial and mechatronic solutions provider, today announced a significant expansion of its manufacturing facility in Bangalore, representing a $10 million strategic investment. The expansion strengthens Stäubli’s position in India’s rapidly growing solar photovoltaic (PV) sector while reinforcing the company’s long-term commitment to the country’s industrial growth and
900Incident Watch is Granted Network Rail Product Approval! Yurtdışı Haberleri by railsistem - Ocak 30, 20260 We are proud to announce that the 900 Incident Watch Camera has received full approval from Network Rail for operational use across the rail network. This achievement follows extensive development, rigorous field trials, and close collaboration with rail industry experts to ensure the system meets the highest standards of safety,
New Current Transformer from Bender Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Bender UK has launched a new split-core measuring current transformer (CT), designed to make it easier to upgrade to the RS4 signal power protection system. The new CT was developed by the technical team in response to customer feedback highlighting a need for larger current transformers to accommodate greater cable sizes. Bender technical
Trainline Calls for Delay Repay Reform in New Campaign Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Trainline has announced the launch of its Fair Play on Delay Repay campaign, which calls on the Government to reform Delay Repay rules and streamline access to compensation for their delayed and or cancelled services. The ticket seller has created the new campaign in response to the existing Delay Repay claims
Deutsche Bahn and Alstom Test Remote Depot Driving of S-Bahn Train Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Deutsche Bahn (DB) and Alstom have completed a test of remote driving technology for a commuter train in a depot environment. This marks the first customer-operated deployment of its kind on a mainline S-Bahn train in Germany. The trial took place in Munich on a works track and involved a commuter
GWR Introduces UK’s First Battery-Only Train into Passenger Service Yurtdışı Haberleri by railsistem - Ocak 30, 20260 Great Western Railway (GWR) will introduce the UK’s first battery-only powered train into passenger service on Saturday 31 January. The Class 230 train will begin operating on the Greenford branch line, replacing a diesel unit. Its first scheduled passenger service will be the 05:30 departure from West Ealing to Greenford. Initially,
London Northwestern and West Midlands Railway Come Under Public Ownership Yurtdışı Haberleri by railsistem - Ocak 30, 20260 From this Sunday, London Northwestern Railway and West Midlands Railway will join the growing list of operators owned by the public. The milestone will see two sides of the West Midlands Trains (WMT) business come under public ownership, marking the fourth operator to enter public ownership under the government’s Passenger Railway
New York’s MTA Records $15.8 Billion in Capital Commitments for 2025 Yurtdışı Haberleri by railsistem - Ocak 29, 20260 New York’s Metropolitan Transportation Authority (MTA) recorded 15.8 billion USD in capital commitments in 2025, the largest single-year total in the agency’s history. The investments support accessibility improvements, state-of-good-repair work, and system expansion projects, including more than 5 billion USD funded through congestion pricing. The commitments also include the first projects under
Canada: Ontario Begins Work on Bowmanville GO Rail Extension Yurtdışı Haberleri by railsistem - Ocak 29, 20260 The Ontario government has started construction on the Bowmanville Extension of GO Transit, a project that will extend the Lakeshore East line by nearly 19 kilometres into Durham Region. The extension is expected to provide regular, two-way service throughout the day, connecting communities from Oshawa to Bowmanville and linking residents to
Alstom Fits 100th Norwegian Train with ERTMS Technology Yurtdışı Haberleri by railsistem - Ocak 29, 20260 Alstom has reached a new milestone in the digital rail transformation of Norway with the upgrade of the 100th train to incorporate onboard European Rail Traffic Management System (ERTMS) signalling technology. The signalling programme, which is one of the most ambitious in Europe, will ultimately see more than 350 trains converted
Spanish Investigators Identify Broken Rail in Fatal Adamuz Derailment Yurtdışı Haberleri by railsistem - Ocak 29, 20260 Spain’s Comisión de Investigación de Accidentes Ferroviarios (CIAF) has reported that a fracture in the running rail was likely present before a high-speed train derailed near Adamuz on 18 January. The incident occurred on the Madrid–Andalusia high-speed corridor. CIAF’s latest report sets out the initial technical findings from on-site inspections and
DLR Extension and New Bakerloo Line Fleet Included in TfL’s Draft Business Plan Yurtdışı Haberleri by railsistem - Ocak 28, 20260 Transport for London (TfL) has set out a programme of investment for the capital’s transport network, with a strong focus on rail. The draft Business Plan includes projects such as extending the Docklands Light Railway (DLR), progressing plans for a new Bakerloo line fleet, introducing new train fleets on the
Hitachi to Supply Advanced Technologies for Sydney Metro West Yurtdışı Haberleri by railsistem - Ocak 28, 20260 Hitachi Rail has announced receipt of a significant new contract to supply advanced technologies for the Sydney Metro West project, an infrastructure plan which aims to connect Greater Parramatta to the Sydney Central Business District (CBD) via a new 24-kilometre underground metro line. Hitachi Rail will provide all Central Control Systems
ABB to Provide Traction and Control Systems for Mumbai Metro Lines 5 and 6 Yurtdışı Haberleri by railsistem - Ocak 28, 20260 ABB has secured an order from Titagarh Rail Systems Ltd. to supply propulsion equipment and Train Control and Management System (TCMS) software for the expansion of the Mumbai Metro network. The contract covers Mumbai Metro Line 5 (Orange Line), which will connect Thane and Kalyan via Bhiwandi, and Line 6 (Pink
Southco Expands Southeast Asia Footprint with Chon Buri Facility Opening Yurtdışı Haberleri by railsistem - Ocak 28, 20260 Southco is proud to announce the grand opening of its new facility in Chon Buri, Thailand marking a significant milestone in the company’s expansion into Southeast Asia. This facility will enhance our ability to serve customers more effectively by reducing lead times, strengthening supply chain resilience, and positioning Southco’s innovative,
HS2 Begins Tunnelling Between Old Oak Common and Euston Station Yurtdışı Haberleri by railsistem - Ocak 27, 20260 HS2 Ltd has celebrated the launch of the project’s latest tunnel boring machine (TBM), which has started its passage from Old Oak Common toward Euston station – marking a key milestone in the delivery of the new, high-speed rail line. The portion of the route itself has been deemed ‘essential’ by
Keolis Awarded New Contract to Operate Virginia Railway Express Yurtdışı Haberleri by railsistem - Ocak 27, 20260 Keolis North America has been awarded a new contract to continue operating and maintaining the Virginia Railway Express (VRE) commuter rail service, following a competitive procurement process. The agreement extends a partnership that began in 2010. The new contract is due to commence in July 2026 and includes options that could
CAF to Modernise Helsinki Metro with New CBTC System Yurtdışı Haberleri by railsistem - Ocak 27, 20260 CAF has been awarded a new contract from Metropolitan Area Transport Ltd, Helsinki City Transport, and Länsimetro Ltd to modernise the entire signalling system on the Helsinki metro. The work will see the full implementation of CAF’s CBTC (Communications-Based Train Control) system, OPTIO, across the city’s network. CAF will install its CBTC
UK: Scarborough Station Restoration Nears Completion Yurtdışı Haberleri by railsistem - Ocak 27, 20260 Network Rail has announced that the year-long restoration of Scarborough station is almost complete, with the 14 million GBP project having seen the installation of a new roof, drainage systems and restored stonework. The station, which has remained open to passengers throughout the work, is set to receive a fully refurbished
Building a Rail Asset Data Store for IoT and Big Data: What Planners Actually Need Yurtdışı Haberleri by railsistem - Ocak 27, 20260 Rail infrastructure teams are being promised a lot from IoT sensors and big data. Condition scores, failure predictions and richer asset information should make it easier to decide where to spend limited budgets. Yet when you talk to planners, they are still building portfolios in spreadsheets and hunting through disconnected
Breaking the Failure Chain: How Proper Reconditioning Protects Railcar Performance Yurtdışı Haberleri by railsistem - Ocak 27, 20260 Introduction: When Small Failures Become Big Problems In the high-stakes world of rail operations, mechanical failures are rarely isolated events. While a maintenance report might attribute a service interruption to a single broken component, the reality is often more complex. A railcar truck assembly is a tightly integrated system where every
Underground Rail Option Approved for LA Metro’s Sepulveda Pass Yurtdışı Haberleri by railsistem - Ocak 26, 20260 Los Angeles County officials have approved an underground heavy rail option for the Sepulveda Transit Corridor Project, which is set to improve public transport between the San Fernando Valley and the Westside. The decision by the Metro Board identifies this option as the Locally Preferred Alternative (LPA) for the corridor. The proposed
US: 2 Line Crosslake Connection to Open on 28 March Yurtdışı Haberleri by railsistem - Ocak 26, 20260 Sound Transit has announced that the new Crosslake Connection will open for passenger service on 28 March, completing the 2 Line that will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station – creating one fully integrated regional light rail system. Operating between Lynwood and Redmond; the
Flix Partners with Tren Maya to Streamline Ticket Booking Across Mexico Yurtdışı Haberleri by railsistem - Ocak 26, 20260 Mexico’s Secretary of Tourism (Sectur) and Flix have partnered to announce the launch of Tren Maya ticket sales through Flix’s global platform. The announcement was made as Mexico participates as Guest Country at the 46th FITUR trade fair. The partnership will see Tren Maya offer its tickets through the Flix platform © Flix From
BNSF Celebrates Opening of New Intermodal Facility in Oklahoma City Yurtdışı Haberleri by railsistem - Ocak 26, 20260 Last Thursday (22 January) saw BNSF Railway and Hobby Lobby Stores, Inc. gather to celebrate the official opening of the Class I railroad’s new intermodal facility in Oklahoma City. Those in attendance included ODOT Executive Director Tim Gatz, Oklahoma City mayor David Holt and other legislative leaders and public-private partners, all
Northern Celebrates One Million Passenger Journeys on Northumberland Line Yurtdışı Haberleri by railsistem - Ocak 26, 20260 More than 100,000,000 passengers have officially travelled along the Northumberland Line in a little over a year, as announced by Northern during an event at Blyth Bebside station this past Friday (23 January). The line re-opened to passengers in December 2024 – the first time it had done so in 60
Shap Derailment Underlines the Importance of Drainage Yurtdışı Haberleri by railsistem - Ocak 23, 20260 The importance of drainage and earthworks management was recently underlined by the initial investigation into the Shap derailment in November. Image of derailed train – By Nodrog © Naylor Fortunately the derailment of a passenger train, which happened on 3 November (2025) after the train hit a landslip at more than 80mph, resulted
Singapore Land Transport Authority Enhances Critical Railway Infrastructure Yurtdışı Haberleri by railsistem - Ocak 23, 20260 Land Transport Authority (LTA) revamps its video transport network to support advanced security and high-resolution video services. Nokia fiber Optical LAN and IP/MPLS solutions used to help LTA upgrade its CCTV system across 50+ train stations located across Singapore. Upgraded LTA video transmission network ensures safety for millions of passengers riding the
Alstom Opens New Welding & Fitting Training Centre in Hungary Yurtdışı Haberleri by railsistem - Ocak 23, 20260 Alstom has officially opened its new welding and fitting training centre in Mátranovák, Hungary, which will be used to train new specialists and provide extensive training for employees already working in a production capacity. The new centre is hoped to strengthen the job market across the region by providing new knowledge
APTA Welcomes Proposed Bipartisan Funding for Public Transit and Rail Yurtdışı Haberleri by railsistem - Ocak 23, 20260 The American Public Transportation Association (APTA) has expressed support for the release of the bipartisan Fiscal Year (FY) 2026 Transportation, Housing and Urban Development (THUD) Appropriations Act, included in H.R. 7148, the Consolidated Appropriations Act, 2026. The legislation provides funding for the majority of public transit and passenger rail projects authorised
Transport Secretary Signs Agreement with Greater Manchester on Northern Powerhouse Rail Yurtdışı Haberleri by railsistem - Ocak 23, 20260 The UK Transport Secretary has signed a formal agreement with Greater Manchester confirming joint work on plans for a new railway linking Liverpool and Manchester via Warrington as part of the Northern Powerhouse Rail (NPR) programme. The agreement follows the Chancellor’s recent announcement of up to 45 billion GBP of funding
Etihad Rail Unveils New Stations on UAE Railway Network Yurtdışı Haberleri by railsistem - Ocak 23, 20260 Etihad Rail has unveiled details of the UAE’s first fully integrated national passenger railway network, which will connect 11 cities and regions through a series of strategically located stations. With the first four stations previously announced in early 2025 (Abu Dhabi, Dubai, Sharjah and Fujairah), Etihad Rail has revealed the remaining
How the Transpennine Route Upgrade Supports Northern Powerhouse Rail Yurtdışı Haberleri by railsistem - Ocak 23, 20260 Last week, Chancellor of the Exchequer Rachel Reeves confirmed 1.1 billion GBP in funding to revive the Northern Powerhouse Rail (NPR) project. The funding will support planning, development and design work, with benefits expected to be delivered from the 2030s. Meanwhile, Network Rail has emphasised that the Transpennine Route Upgrade (TRU)
Chile: Santiago Metro and Alstom Present First Trains for Future Line 7 Yurtdışı Haberleri by railsistem - Ocak 22, 20260 Santiago Metro and Alstom have presented the first train that will operate on Santiago’s future Metro Line 7. The presentation took place on 20 January 2026 at Alstom’s manufacturing facility in Taubaté, in the state of São Paulo, Brazil, where the trains are being built. The train is part of a contract
CPKC Invests $800 Million in American Locomotives Yurtdışı Haberleri by railsistem - Ocak 22, 20260 Canadian Pacific Kansas City (CPKC) is continuing the renewal of its locomotive fleet with a multi-year investment of over 800 million USD in American manufacturing. In 2025, CPKC completed the acquisition of 100 Tier 4 locomotives from Wabtec, produced at the company’s Texas facility. The railway operator has now confirmed plans
Rail Baltica to Construct Region’s Largest Rolling Stock Depot in Estonia Yurtdışı Haberleri by railsistem - Ocak 22, 20260 Rail Baltic Estonia has announced plans to build a rolling stock depot in Rae municipality, Harju County, with construction expected to be completed by the end of 2028. The facility will centralise the maintenance, repair, and operation of the future high-speed railway’s rolling stock in Estonia. Rail Baltica to build Baltic region’s
UK: Beacon Completes Acquisition of Eversholt Rail Yurtdışı Haberleri by railsistem - Ocak 22, 20260 Beacon has completed the acquisition of Eversholt Rail, one of the UK’s established rolling stock leasing companies. The transaction was announced on 21 January 2026 and was completed following regulatory and competition reviews, which did not identify any competition concerns. Visualisation of trains supplied by Eversholt Rail © Lumo The acquisition expands Beacon’s scale
US: Siemens Mobility to Supply Seven Charger Locomotives to Tri-Rail Yurtdışı Haberleri by railsistem - Ocak 22, 20260 Siemens Mobility has been awarded a contract for the supply of seven advanced Charger diesel-electric locomotives from the South Florida Regional Transportation Authority (SFRTA),the operator of Tri-Rail commuter rail services in Broward, Miami-Dade and Palm Beach. The new vehicles are expected to enter service in 2029, forming part of Tri-Rail’s commitment
Northern to Introduce Hundreds of New Trains on Regional Network Yurtdışı Haberleri by railsistem - Ocak 22, 20260 Northern’s recently appointed Director of New Rolling Stock Programmes, James Howard, has stated that the operator intends to buy ‘hundreds’ of new trains in a bid to transform travel for millions of rail customers in the region. The statement comes as Northern begins planning to make the largest fleet investment in
Busy Metro Line Set for Temporary Closure During Improvement Works Yurtdışı Haberleri by railsistem - Ocak 21, 20260 A section of the Metro line serving both North Tyneside and Newcastle is set to undergo a significant programme of essential renewal work next month as investments are made to improve general infrastructure. The project will take place over a five-day major line closure between Shiremoor and St James, in both
Poland: Power Supply Agreement Signed for Warsaw–Łódź High-Speed Rail Line Yurtdışı Haberleri by railsistem - Ocak 21, 20260 Centralny Port Komunikacyjny (CPK) has contracted Polskie Sieci Elektroenergetyczne (PSE) to provide power connections for the high-speed rail line between Warsaw and Łódź, forming part of Poland’s Port Polska investment programme. CPK and PSE will work together to connect traction substations on the route to the national transmission grid. The total value