Hungary: Alstom to Build Logistics Hall at Mátranovák Factory Yurtdışı Haberleri by railsistem - Ocak 17, 20250 Alstom is investing 600 million HUF (1.5 million EUR) to construct a logistics hall at its factory in Mátranovák, Hungary. The project is the final stage of the 6 billion HUF (145 million EUR) Mátranovák 2030 Development Program, supported by the Hungarian Government. Alstom’s Mátranovák site © Alstom The new 827-square-metre facility will enhance
Alstom UK and Ireland Appoints Rob Whyte as New Managing Director Yurtdışı Haberleri by railsistem - Ocak 17, 20250 Alstom has announced the appointment of Rob Whyte as Managing Director for the UK and Ireland. This marks a return to the region for Whyte, who most recently served as Managing Director for Alstom in the Nordics. Whyte’s career with Alstom began over three decades ago as an apprentice in the company’s
Canada: Alstom to Modernise 181 Metrolinx Rail Cars Yurtdışı Haberleri by railsistem - Ocak 16, 20250 Alstom has secured a major agreement with Metrolinx to overhaul and modernise 181 Bi-Level commuter rail cars for GO Transit in Ontario, Canada. Valued at approximately 500 million CAD (340 million EUR), the project will extend the lifespan of the railcars while also enhancing passenger comfort and sustainability. Alstom to overhaul and
Alstom Spain’s Talent Energy Programme for Students and Graduates Yurtdışı Haberleri by railsistem - Ocak 13, 20250 Alstom has announced the launch of the 12th edition of its Talent Energy Programme in Spain. Designed for final-year university students and recent graduates, the initiative combines postgraduate education with practical work experience, equipping participants with the skills required to excel in the railway sector. The programme offers scholarships for postgraduate studies
UK: Southeastern Class 376 Fleet To Undergo Refurbishment Yurtdışı Haberleri by railsistem - Ocak 10, 20250 Southeastern has announced that its Class 376 fleet is set to receive a significant makeover as part of a major refurbishment process. The refresh will see each of the operators 36 Electrostars receive both an interior and exterior overhaul, the implementation of at-seat USB/power sockets, new LED lighting and a blue
Alstom’s RER NG Enters Commercial Service on the RER D Line Yurtdışı Haberleri by railsistem - Ocak 6, 20250 Alstom’s RER NG Enters Commercial Service on the RER D Line of the Île-de-France Mobilités Network Île-de-France Mobilités, SNCF Voyageurs, SNCF Réseau and Alstom are putting into service RER NG (NG stands for “New Generation”), on the RER D Line. Running on RER Line E since November 2023, RER NG has been
Alstom to Open Derby Factory to the Public for the First Time Yurtdışı Haberleri by railsistem - Ocak 2, 20250 Alstom has announced plans to open its Derby Litchurch Lane rolling stock factory to the public for the first time in 2025. The event, titled “The Greatest Gathering,” will take place from 1 to 3 August as part of the Railway 200 celebrations, marking two centuries of Britain’s railway history. The event
Alstom to Provide Maintenance for Panama Metro’s Line 1 Yurtdışı Haberleri by railsistem - Aralık 24, 20240 Alstom has signed a new four-year contract for the maintenance of Panama Metro’s (PMSA) Line 1. The contract includes maintenance of 26 Alstom Metropolis trains and their associated bogies, brakes, couplings and pantographs, alongside general maintenance of the line’s power system. Alstom has been present in Panama actively contributing to the development
Alstom Refurbishes South Western Railway’s Class 458 Fleet Yurtdışı Haberleri by railsistem - Aralık 19, 20240 Alstom has successfully completed a 25 million GBP upgrade of South Western Railway’s (SWR) Class 458 electric multiple unit (EMU) fleet. The extensive refurbishment, financed by rolling stock asset manager Porterbrook, was carried out at Alstom’s Technology Centre in Widnes and its historic Crewe Works. Class 458 refurbishment place taking place at
Sweden: Alstom Signs 10 Year Maintenance Contract for Norrtåg Fleet Yurtdışı Haberleri by railsistem - Aralık 16, 20240 Alstom has signed a new 10-year contract for the maintenance of Swedish operator VR’s Norrtåg fleet. The contract, which is valued at over 60 million EUR, will see Alstom carry out both preventative and corrective maintenance, de-icing, overhauls, repairs and wheel turning for the fleet’s 12 Coradia Nordic units. With the new
California: Alstom to Provide Operations and Maintenance Services for Metrolink Yurtdışı Haberleri by railsistem - Aralık 11, 20240 Alstom has been awarded a new contract by the Southern California Regional Rail Authority (Metrolink) to provide operations, servicing, and maintenance for the region’s rail system. The agreement, valued at 515 million USD for an initial five-year term, will run from January 2025 to June 2030. It includes an option to
France: Alstom’s New-Generation Citadis Tram Launches on Line T1 Yurtdışı Haberleri by railsistem - Aralık 10, 20240 Alstom has officially launched its new-generation Citadis tram, known as TW20, into passenger service on Line T1 of the Île-de-France Mobilités network. This modern tram replaces the region’s oldest trams, some of which have been in operation since 1992. It offers improved capacity, accessibility, and environmental performance. Alstom’s New-Generation Citadis Tram © Alstom The
Alstom to Supply 35 Additional RER NG Trains in Paris Yurtdışı Haberleri by railsistem - Aralık 9, 20240 Alstom will provide 35 additional RER NG trains for the RER E line within the Île-de-France Mobilités network in Paris. This order, valued at approximately 520 million EUR, is fully financed by Île-de-France Mobilités and follows the framework agreement established in 2017 between SNCF Voyageurs and Alstom. The order raises the total
Amtrak Presents Details of Its NextGen Acela Fleet Yurtdışı Haberleri by railsistem - Aralık 5, 20240 Amtrak has presented details of its NextGen Acela high-speed trainsets, manufactured by Alstom. These units are set to enter service on the Northeast Corridor (NEC) in spring 2025 The new trainsets aim to modernise rail travel, offering enhanced comfort, improved sustainability, and state-of-the-art technology. Amtrak’s Acela II testing on the Northeast Corridor ©
UK: South Western Railway Launches Aventra Fleet Yurtdışı Haberleri by railsistem - Aralık 5, 20240 South Western Railway (SWR) has launched its new Aventra fleet, consisting of 90 Class 701 Arterio trains built by Alstom in Derby. The 1 billion GBP fleet will replace SWR’s older Class 455 models. Each ten-car Arterio train increases capacity by over 50% compared to the eight-car predecessors, addressing the growing
Riyadh Metro to Commence Service in Saudi Arabia Yurtdışı Haberleri by railsistem - Kasım 30, 20240 Alstom has celebrated the launch of the Riyadh Metro network in Saudi Arabia. This project aligns with Saudi Arabia’s Vision 2030, aiming to enhance urban mobility, reduce congestion, and improve air quality in the capital city. The 176-kilometre network, developed by the Royal Commission for Riyadh City (RCRC), comprises six lines, 85
Alstom Reported to Add Over $500M to Canada’s Economy Annually Yurtdışı Haberleri by railsistem - Kasım 28, 20240 Alstom has released its first socio-economic impact report in Canada, developed in partnership with EY. The report details Alstom’s significant contributions to the Canadian economy and communities during the fiscal year 2023/24. According to the report, Alstom’s activities added approximately 575 million CAD to Canada’s GDP. The company worked with 920 local
Alstom Renews Contract to Operate and Maintain Denver Airport APM Yurtdışı Haberleri by railsistem - Kasım 26, 20240 Alstom has signed a contract with Denver International Airport to continue the operation and maintenance of the automated people mover (APM) for a further seven years. The APM system, which operates Alstom’s Innovia APM R vehicles and first-generation Innovia APM cars, measures 1.2 miles in length and connects the distant concourses
Saudi Arabia: Alstom to Enhance Reliability of East-West Freight Corridor Yurtdışı Haberleri by railsistem - Kasım 22, 20240 Alstom has secured a five-year Technical Support and Spare Part Supply Agreement (TSSSA) with Saudi Railway Company (SAR) to enhance the efficiency and reliability of diesel locomotives operating on Saudi Arabia’s east-west freight corridor. The 300 million SAR contract was announced at the Saudi Rail Exhibition. It involves technical assistance, spare
Romania: Alstom and ARF Deploy Coradia Stream Electric Train Yurtdışı Haberleri by railsistem - Kasım 21, 20240 Alstom and Romania’s Railway Reform Authority (ARF) have launched the first of 37 Coradia Stream regional electric trains into commercial service. Following 10,000 km of testing, the train began operations on the Bucharest-Brasov route on 20 November, marking the arrival of Romania’s first new electric train in 30 years. This train is
Alstom Completes Manila Light Rail Transit Line 1 Cavite Extension Yurtdışı Haberleri by railsistem - Kasım 19, 20240 Alstom has completed the Manila Light Rail Transit Line 1 Cavite Extension. It entered passenger service on 16 November 2024, after it was officially inaugurated by the President of the Philippines, Ferdinand Marcos Jr. along with officials from the Department of Transport and representatives of the Light Rail Manila Corporation (LRMC). Alstom
First Alstom X’trapolis Electric Train Unveiled for Dublin Yurtdışı Haberleri by railsistem - Kasım 18, 20240 At Inchicore Works in Dublin, Alstom has unveiled the first train in Irish Rail’s order for 185 new electric and battery-electric carriages for the DART+ fleet. Invited guests previewed the five-carriage train, which will improve capacity, accessibility, and customer experience across the Greater Dublin Area from 2026. Iarnród Éireann has unveiled the
Alstom Reports Strong First Half of FY 2024/25 Yurtdışı Haberleri by railsistem - Kasım 15, 20240 Alstom has reported on its commercial performance for the first half of the fiscal year 2024/25 (1 April – 30 September 2024), demonstrating significant commercial successes and strong financial results. The rolling stock manufacturer states that these achievements underscore its ongoing efforts to drive growth, enhance operational efficiency, and solidify its
Alstom Delivers First Trainset for Taipei’s Wanda Line Yurtdışı Haberleri by railsistem - Kasım 13, 20240 Alstom has delivered the first fully automated Metropolis trainset for the new Wanda-Zhonghe-Shulin Line in Taipei. This 22.8-kilometre medium-capacity metro line will significantly improve connectivity between Taipei and New Taipei City. It will serve densely populated areas in New Taipei, such as Zhonghe, Shulin, Tucheng, and Xinzhuang, providing residents with an efficient,
Alstom’s APS Catenary-Free Technology Extends Barcelona’s Tramway Yurtdışı Haberleri by railsistem - Kasım 11, 20240 Alstom’s APS (Alimentation Par Sol) catenary-free technology has made its debut on the Spanish rail network, equipping Barcelona Metropolitan Transport Authority’s (ATM) new tramway extension. This catenary-free tram line supports Barcelona’s broader goals for sustainable and accessible urban transit. The 2-kilometre expansion enables the Barcelona tramway to carry an additional 24,000 passengers
Alstom Delivers New Signalling System in South London Yurtdışı Haberleri by railsistem - Kasım 8, 20240 Alstom has delivered a new signalling system in South London, enhancing reliability for passengers travelling in and out of London Victoria. The updated system has been implemented as part of a major Network Rail upgrade initiative to modernise signalling on the lines into London Victoria, the UK’s fifth busiest station. Three Bridges
Alstom to Overhaul Citadis Tram Fleet in Madrid Yurtdışı Haberleri by railsistem - Ekim 31, 20240 Metro Ligero Oeste (MLO) has signed a comprehensive overhaul contract with Alstom to perform essential mid-life upgrades to its fleet of Citadis trams in Madrid, Spain. This agreement covers 27 Alstom Citadis trams, in service since 2007, and will ensure ongoing quality, safety, and reliability. The contract includes a mid-life general overhaul
Alstom Delivers Driving Simulator for Bucharest’s New Metro Trains Yurtdışı Haberleri by railsistem - Ekim 29, 20240 Alstom has delivered a driving simulator to Bucharest’s metro operator, Metrorex to support driver training on the new Metropolis metro trains for Line 5. Designed to enhance practical driver training, the simulator leverages advanced Virtual Reality (VR) technologies, creating a “Digital Twin” of the real metro environment, including tracks, stations, and
Public Consulted on Interior Design of HS2 Trains Yurtdışı Haberleri by railsistem - Ekim 23, 20240 The Hitachi-Alstom consortium contracted to build the high-speed trainsets for HS2, has consulted the public regarding the design on the new vehicles. Starting in early 2024, different customer groups, ranging from people with reduced mobility to cyclists and young families, have been invited to get a feel for life-sized wooden mock-ups
Alstom Delivers First Driverless Trainset for Chennai Metro Phase II Yurtdışı Haberleri by railsistem - Ekim 18, 20240 Alstom has successfully delivered the first Metropolis metro train for the Chennai Metro Phase II project. Manufactured in its Sricity site in Andhra Pradesh and designed in Bangalore (Karnataka), these trains are 100% ‘made in India’. They have a top operating speed of 90km/h with a standard operating speed of 80km/h. Metro
Alstom Partners with Centech to Accelerate Rail Innovation in Canada Yurtdışı Haberleri by railsistem - Ekim 17, 20240 Alstom has formalised a two-year partnership with Centech, a Montreal-based technology incubator, aimed at accelerating the development of innovative and sustainable rail solutions. This partnership will involve working closely with start-ups in Quebec and across Canada to foster advancements in intelligent mobility. Alstom and Centech to accelerate innovation in intelligent and sustainable
Alstom and Škoda Collaborate on ETCS Deployment in Europe Yurtdışı Haberleri by railsistem - Ekim 16, 20240 Alstom and Škoda Group have signed a collaboration agreement to supply Alstom’s ETCS Level 2 systems in Škoda trains for RegioJet in the Czech Republic. Through this agreement, the system will be installed in 23 electric units, with deliveries expected to commence in the first half of 2025. Alstom strengthens its position
Alstom to Modernise Railway Signalling in Chile Yurtdışı Haberleri by railsistem - Ekim 9, 20240 Alstom has been contracted by EFE Trenes de Chile to modernise the railway signalling system across Chile’s 1,800-kilometre network. This collaboration will launch the Virtual Signalling Control (CSV) project to enhance communication and signalling on Chile’s railways for both passenger and freight services. Railway operations in Chile © Germán Saavedra Rojas This project aims
Mumbai Metro Aqua Line Inaugurated with Alstom’s Driverless Trains Yurtdışı Haberleri by railsistem - Ekim 7, 20240 On 5 October 2024, the first phase of Mumbai Metro’s Aqua Line was inaugurated for commercial service. The system features Alstom’s advanced Metropolis driverless trains and signalling solutions. The line, which spans 33.5 kilometres, connects the Bandra Kurla Complex business district to Aarey JVLR, representing Mumbai’s first underground metro. Honourable Prime Minister
France: Proxima Orders 12 Avelia Horizon High-Speed Trains from Alstom Yurtdışı Haberleri by railsistem - Ekim 4, 20240 Independent high-speed rail operator, Proxima has ordered 12 Avelia Horizon very high-speed trains from Alstom for operations in France. Under this contract, Alstom will also provide 15 years of maintenance for the new rolling stock. The maintenance will be carried out in a workshop designed and built by Liséa in Marcheprime,
Alstom to Open New Project Office in Philadelphia Yurtdışı Haberleri by railsistem - Ekim 3, 20240 Alstom is opening a new project office in Center City, Philadelphia to support the delivery of key transportation projects in the city and throughout the Northeast Corridor. This initiative will further strengthen Alstom’s collaboration with its customers, including the Southeastern Pennsylvania Transportation Authority (SEPTA). Alstom will deliver fully customised, sustainable, next-generation Citadis
Alstom Consolidates European Operations with New Regional Structure Yurtdışı Haberleri by railsistem - Ekim 1, 20240 Following its acquisition of Bombardier Transportation three and a half years ago, Alstom is restructuring its European operations to further strengthen its presence in the region. As part of the restructuring, the DACH region (Germany, Austria, and Switzerland) will be combined with the Nordics cluster (Denmark, Sweden, Norway, Finland, and Iceland)
InnoTrans 2024: Alstom and Airbus Address Cybersecurity in Rail Yurtdışı Haberleri by railsistem - Eylül 25, 20240 At InnoTrans 2024, Alstom and Airbus Protect marked a significant achievement in their ongoing partnership to enhance cybersecurity in the rail sector. Since signing a global cooperation agreement in September 2021, the companies have made substantial progress in developing and testing a comprehensive Risk Assessment Methodology tailored for rail transport. This
InnoTrans 2024: Alstom and Airbus Address Cybersecurity in Rail Yurtdışı Haberleri by railsistem - Eylül 25, 20240 At InnoTrans 2024, Alstom and Airbus Protect marked a significant achievement in their ongoing partnership to enhance cybersecurity in the rail sector. Since signing a global cooperation agreement in September 2021, the companies have made substantial progress in developing and testing a comprehensive Risk Assessment Methodology tailored for rail transport. This
InnoTrans 2024: Alstom Presents Berlin’s Longest Tram Yurtdışı Haberleri by railsistem - Eylül 25, 20240 At InnoTrans 2024, Alstom is exhibiting the Urbanliner Flexity tram, the longest in Berlin. The new nine-section version is 50.89 metres long: the equivalent of approximately 10 elephants! This longer model will be rolled out to increase capacity on the city’s busy M4 route. The Urbanliner Flexity tram for Berlin © a2b Global
InnoTrans 2024: Alstom’s Coradia Max for Germany Yurtdışı Haberleri by railsistem - Eylül 24, 20240 One of the vehicles on display this year at InnoTrans is Alstom’s Coradia Max for Landesnahverkehrsgesellschaft Niedersachsen (LNVG). This train has a central portion that is single-deck and flanking portions that are double-deck. Alstom Coradia Max During the presentation Alstom highlighted several aspects of the train that were pushed for by the customer
InnoTrans 2024: AI in the Mobility Sector Yurtdışı Haberleri by railsistem - Eylül 24, 20240 At this year’s opening ceremony, the two panel discussions focused on AI and its impact and importance for the rail sector. The rolling stock manufacturers were represented by Henri Poupart-Lafarge, CEO of Alstom, Javier Martínez Ojinaga, CEO of CAF, and Michael Peter, CEO of Siemens Mobility. InnoTrans 2024: From Hype to Reality
Mexico: Alstom Delivers First Long Distance Tren Maya Train Yurtdışı Haberleri by railsistem - Eylül 21, 20240 Alstom has delivered the first Long Distance train for the Tren Maya project in Mexico. These trains aim to provide passengers with enhanced safety, comfort, and modern amenities for day and night travel. Alstom has delivered the first Long Distance train for the Tren Maya project © Alstom The Long Distance Train (P’atal) offers
Alstom Announces €63 Million Investment in Italy Yurtdışı Haberleri by railsistem - Eylül 20, 20240 Alstom has announced a 63 million EUR investment plan for its operations in Italy from 2024 to 2026. This investment underscores Alstom’s commitment to economic growth, technological innovation, and environmental sustainability in the country. The investment will impact all nine of Alstom’s sites across Italy. Alstom in Italy © Alstom Key projects in the investment
UK: Alstom Completes First Phase in Overhaul of Pendolino Train Bogies Yurtdışı Haberleri by railsistem - Eylül 18, 20240 Alstom has reached a significant milestone in the overhaul of train bogies for Avanti West Coast’s Class 390 Pendolino fleet. This overhaul is part of the heavy maintenance of Avanti’s 35 11-carriage Pendolino trains, which have each covered over 750,000 miles. Alstom has now completed bogie sets on all 35 11-carriage
Alstom to Upgrade Automated People Mover at LAS Airport Yurtdışı Haberleri by railsistem - Eylül 12, 20240 Alstom has signed a contract with the Clark County Department of Aviation to upgrade the Automated People Mover (APM) system at Harry Reid International Airport (LAS) in Las Vegas. This 84 million USD project will introduce ten new Innovia APM R vehicles. It will also involve comprehensive system upgrades to enhance
Alstom Announces Details for InnoTrans 2024 Exhibit Yurtdışı Haberleri by railsistem - Eylül 12, 20240 Alstom has announced details of its upcoming participation at InnoTrans 2024, which is set to take place in Berlin from 24-27 September 2024. At the event, Alstom will focus on decarbonising rail, maximising system performance, and elevating the passenger experience. Team Alstom will exhibit at stand 450 in Hall 3.2 © Alstom These themes
Alstom to Unveil Test Lab for Rail Safety Systems Yurtdışı Haberleri by railsistem - Eylül 11, 20240 Alstom is set to unveil a new Test Lab for rail safety systems at the Raildagen (Raildays) 2024 event in Utrecht, Netherlands. Organised by the Dutch association Railforum, the event will take place on 20 and 21 September, offering the public a closer look at the rail industry and its latest
UK: Alstom Introduces Maternity Policy with 12 Months Full Pay Yurtdışı Haberleri by railsistem - Eylül 9, 20240 Alstom has unveiled a new maternity and adoption leave policy that offers full pay for up to 52 weeks to its UK employees. This sector-leading policy advances Alstom’s commitment to gender equality and employee well-being and aims to mitigate the effects of the ‘pregnancy penalty’ faced by many women. This initiative is
Alstom Completes Sale of North American Signalling Business Yurtdışı Haberleri by railsistem - Eylül 2, 20240 Alstom has completed the sale of its North American conventional signalling business to Knorr-Bremse AG. The business was sold for a purchase price of approximately 690 million USD. This follows the binding agreement signed by the two companies on 19 April 2024. Knorr-Bremse is taking over Alstom’s railway signalling business in North
Alstom to Deliver Traxx Universal Locomotives to Captrain Polska Yurtdışı Haberleri by railsistem - Ağustos 30, 20240 Alstom has secured a new contract to supply three electric Traxx Universal multi-system locomotives to Captrain Polska, an independent railway operator in Europe. These third-generation locomotives will support intermodal operations across six countries: Poland, Germany, Austria, France, Belgium, and Luxembourg. The locomotives will be produced at Alstom’s facility in Kassel, Germany, while
Sweden: Alstom Delivers New Trams to Gothenburg Yurtdışı Haberleri by railsistem - Ağustos 28, 20240 Alstom has delivered the first of 60 M34 trams to Västtrafik in Gothenburg, Sweden. These new models are 45 metres long, making them 12 metres longer than the city’s current vehicles. Due to their increased size, they can accommodate almost twice as many passengers, with room for 319 people. The arrival of
Alstom Completes Dynamic ETCS Testing on UK Passenger Train Yurtdışı Haberleri by railsistem - Ağustos 27, 20240 Alstom has completed dynamic European Train Control System (ETCS) testing on Govia Thameslink Railway’s Great Northern Class 387/1 passenger train in the UK. This milestone advances progress on introducing digital in-cab signalling to the UK’s East Coast Main Line. Key UK passenger train completes dynamic ETCS testing © Alstom The dynamic testing involved retrofitting
Alstom to Refurbish CrossCountry Voyager Fleet in Derby Yurtdışı Haberleri by railsistem - Ağustos 19, 20240 Alstom has been contracted to refurbish CrossCountry’s Voyager fleet to enhance the customer experience. This 60 million GBP upgrade will refresh the interior and exterior of the trains at Alstom’s Derby facility. The work will see the vehicles equipped with new seats, tables and flooring from 2025. In addition, the trains will
Hanoi Metro Line 3 Commences Passenger Service Yurtdışı Haberleri by railsistem - Ağustos 9, 20240 Alstom has celebrated the start of revenue service on the elevated section of Hanoi Metro Line 3 on 8 August 2024. Operated by Hanoi Metro Company (HMC), the line is now available for free public trials and will be officially inaugurated in September 2024. This project marks the deployment of Alstom’s first
Alstom’s Innovia APM Train Starts Service on Singapore’s Bukit Panjang LRT Yurtdışı Haberleri by railsistem - Ağustos 2, 20240 The first two sets of Alstom’s Innovia Automated People Mover (APM) 300R trains have begun operation on the Bukit Panjang Light Rail Transit (BPLRT) line in Singapore. This marks the start of the gradual deployment of the new trains, which were handed over to Singapore’s Land Transport Authority (LTA). Alstom’s Automated Innovia
Poland: Alstom to Modernise Railway Traffic Control System in Katowice Yurtdışı Haberleri by railsistem - Temmuz 31, 20240 Alstom has been contracted to modernise the railway traffic control system in Katowice, Poland, specifically along the E65 railway line from Katowice Szopienice South to Katowice Piotrowice. The reconstruction of line E65 is the largest infrastructure project in the history of Polish railways. The project will be carried out by general
Alstom Contracted to Maintain TransPennine Express Class 397 Fleet Yurtdışı Haberleri by railsistem - Temmuz 29, 20240 Alstom has been awarded a contract extension from TransPennine Express (TPE) to maintain its Class 397 fleet. This agreement is valued at 10.4 million GBP and will support more than 50 jobs across England and Scotland. TransPennine Express’ Class 397 model – known as Nova 2 © Alstom The contract will see Alstom continue
NJ TRANSIT to Purchase 36 New Rail Cars from Alstom Yurtdışı Haberleri by railsistem - Temmuz 29, 20240 NJ TRANSIT’s Board of Directors has approved the purchase of 36 additional Multilevel III rail cars from Alstom. These new rail cars will offer increased seating capacity, mechanical reliability and improved customer amenities. They will also increase the maximum speed of the NJ TRANSIT trains to 110 miles per hour. Multilevel III
Alstom to Overhaul Buenos Aires Metro Trains Yurtdışı Haberleri by railsistem - Temmuz 26, 20240 EMOVA has contracted Alstom to overhaul its fleet of 60 Metropolis 300 model cars for the Buenos Aires Metro. The 300 cars make up 10 trains that serve customers on lines D and H in Buenos Aires, Argentina. More than 800,000 users use the Buenos Aires metro daily © Philip Choi The contract has
Alstom to Supply 90 S-Bahn Cologne Trains Yurtdışı Haberleri by railsistem - Temmuz 25, 20240 Alstom has been awarded a 4 billion EUR contract to supply and maintain 90 commuter trains for go.Rheinland and Verkehrsverbund Rhein-Ruhr (VRR) to operate on the S-Bahn Cologne in Germany. This contract includes the supply of 90 Adessia Stream trains and the provision of their maintenance over 34 years. An exterior rendering
Alstom and DT Infrastructure to Deliver Perth’s High-Capacity Signalling Project Yurtdışı Haberleri by railsistem - Temmuz 22, 20240 Alstom and DT Infrastructure have been awarded a 1.6 billion AUD contract from the Public Transport Authority (PTA) of Western Australia to complete Perth’s High-Capacity Signalling project. This contract covers the design, supply, construction, installation, testing, commissioning, and maintenance of an advanced high-capacity signalling system for Perth’s suburban rail network. The new
Alstom to Upgrade Up to 449 ÖBB Trains with ETCS Yurtdışı Haberleri by railsistem - Temmuz 18, 20240 Alstom has been contracted to upgrade up to 449 ÖBB vehicles with the latest European Train Control System (ETCS) technology. This contract has a value of up to 100 million EUR and a project duration until 2030. Alstom’s ETCS onboard unit © Alstom By supplying ÖBB with the latest onboard signalling systems, Alstom will
Alstom to Supply Up to 374 Metro Trains and CBTC Signalling for Hamburg U-Bahn Yurtdışı Haberleri by railsistem - Temmuz 10, 20240 Alstom and Hamburger Hochbahn have signed a framework contract valued at up to 2.8 billion EUR to supply new metro trains and CBTC signalling technology for the Hamburg U-Bahn. Under this contract, Alstom will supply up to 374 new fully and semi-automated metro trains. In addition, it will provide its CBTC
Alstom Prioritises Accessibility in Public Transport Yurtdışı Haberleri by railsistem - Temmuz 8, 20240 To meet the accessibility and inclusivity values within its ESG strategy, Alstom continues to work with Fundación ONCE. Throughout its train concepts and designs, the rolling stock manufacturer aims to improve and add value for customers worldwide. Alstom therefore collects and analyses feedback from passengers to help evolve the transport industry. For
Brazil: Alstom Unveils Design of São Paulo Metro Line 6-Orange Trains Yurtdışı Haberleri by railsistem - Temmuz 1, 20240 Alstom and Linha Universidade (LinhaUni) have revealed the design for the São Paulo Metro’s Line 6-Orange trains. These trains are characterised by distinctive orange accents and are equipped with modern features that aim to enhance the passenger experience and optimise energy efficiency. For example, lightweight materials will enable the trains to consume
Alstom Delivers MP14 Metros for Paris’ Line 14 Extension Yurtdışı Haberleri by railsistem - Haziran 28, 20240 Alstom has celebrated the delivery of its MP14 rubber-tyred metro, coinciding with the opening of the Line 14 extension in Île-de-France. The extension, inaugurated on 24 June, now connects Saint-Denis Pleyel to Orly Airport, reducing travel time to 40 minutes. This new service is expected to cater to one million passengers. Alstom’s
Alstom Completes UK’s Largest Fleet Upgrade for Avanti West Coast Yurtdışı Haberleri by railsistem - Haziran 26, 20240 Alstom has delivered the UK’s largest-ever fleet upgrade, completing a 117 million GBP refurbishment programme for Avanti West Coast’s Class 390 Pendolino trains. The final refurbished train departed from Alstom’s Transport Technology Centre in Widnes on 24 June, concluding the delivery of 574 refurbished carriages. Throughout the project, the refurbished trains
Italy: Mercitalia Rail Orders 70 Alstom Traxx Universal Locomotives Yurtdışı Haberleri by railsistem - Haziran 21, 20240 Alstom has been contracted to supply 70 Traxx Universal locomotives for Mercitalia Rail, part of Polo Logistica FS in Italy. The agreement is valued at 323 million USD and includes 12 years of comprehensive maintenance services. It also provides an option for up to 30 additional locomotives and an extension of the
UK: Alstom Confirms Derby Order for New Elizabeth Line Trains Yurtdışı Haberleri by railsistem - Haziran 16, 20240 Alstom has signed a contract to manufacture 10 Aventra trains for the Elizabeth line in London. This order is valued at 370 million GBP (430 million EUR) and includes maintenance services until 2046. Aventra Elizabeth line train being built in Derby © Alstom The trains will be manufactured at Alstom’s UK facility in Derby,
Alstom to Supply Twelve Additional Trams to Zurich Yurtdışı Haberleri by railsistem - Haziran 10, 20240 Alstom is set to supply 12 Flexity trams to Verkehrsbetriebe Zürich (VBZ). Building on the company’s initial order of 70 units in 2017, the additional 12 trams are part of an included option of a further 70 vehicles. More than 60 Alstom Flexity trams are already in operation in Zurich © Alstom With more
TW20 Alstom Tram Commences Dynamic Testing in Île-de-France Yurtdışı Haberleri by railsistem - Haziran 8, 20240 Île-de-France Mobilités has announced that the new TW20 tram has commenced dynamic tests in preparation for the start of service on the T1 tramway. The new generation tram will equip line T1 at the end of 2024. This 100% accessible vehicle will gradually replace the old trains on the oldest tramway
India: Alstom Delivers First Train for Pune Metro Line 3 Yurtdışı Haberleri by railsistem - Haziran 6, 20240 Alstom has successfully delivered the first Metropolis metro train for Line 3 of the Pune Metro under a 2021 contract with the Pune Metropolitan Region Development Authority (PMRDA). To deliver the elevated Pune Metro Line 3, PMRDA contracted a joint venture formed of Alstom India, TRIL Urban Transport Private Limited, and
Alstom to Supply 6 Additional Vancouver SkyTrain Mark V Trains Yurtdışı Haberleri by railsistem - Haziran 3, 20240 Alstom has been awarded a contract to supply 6 additional Vancouver SkyTrain Mark V trains to TransLink. This contract is valued at around 86 million EUR (123 million CAD). The new trains will be designed, manufactured and tested in Canada at Alstom’s facilities in Kingston, ON, La Pocatière and Saint-Bruno-de-Montarville, QC. Alstom Skytrain
UK: Alstom to Refurbish c2c Class 357 Fleet Yurtdışı Haberleri by railsistem - Mayıs 20, 20240 Alstom has been awarded an 8.8 million GBP contract from British train operator, c2c to refurbish its Class 357 Electrostar fleet. This project will involve the painting and repair of 74 four-car units originally constructed at Alstom’s Derby Litchurch Lane facility between 1999 and 2002. A c2c Class 357 © Alstom The scope of
Derby City Council Confirms Potential Train Order for Alstom Yurtdışı Haberleri by railsistem - Nisan 24, 20240 Derby City Council has confirmed plans from the UK government to order new Elizabeth Line trains from Alstom’s UK rolling stock factory. This follows news from the end of 2023 that the manufacturer was planning to cease rolling stock production at its Litchurch Lane facility due to delays in future contracts. Indeed,
Alstom Completes Electric Train Maintenance Depot in Romania Yurtdışı Haberleri by railsistem - Nisan 24, 20240 Alstom has completed work on a new maintenance depot in Romania that will test and validate the nation’s new electric trains. The new depot, situated in the Grivita area of Bucharest, is Romania’s first depot built for the maintenance and testing of electric trains and locomotives. Its location provides convenient access
Alstom to Sell North American Signalling Business to Knorr-Bremse Yurtdışı Haberleri by railsistem - Nisan 22, 20240 Knorr-Bremse AG is entering the Control, Command and Signaling (CCS) market by acquiring the Alstom Signaling North America business. This transaction is valued at 630 million EUR and is expected to close in summer 2024. It will see Knorr-Bremse expand its current portfolio, which provides braking systems and other components for rail
Alstom to Supply Metropolis Trains for Santo Domingo Metro Extension Yurtdışı Haberleri by railsistem - Nisan 18, 20240 The Transport Reordering Office (OPRET) has contracted Alstom to supply new trains for the extension of Line 2 on the Santo Domingo Metro in the Dominican Republic. Under this order, Alstom will manufacture, supply and put into service eight new Metropolis 3-car trains to operate on Line 2C of the Santo
Alstom Electric C-Series Train Starts Passenger Service in Perth Yurtdışı Haberleri by railsistem - Nisan 11, 20240 The first of Alstom’s electric C-series trains has entered passenger service in Perth for the Western Australia Railcar Program. This unit was delivered under a 2019 contract valued at 800 million EUR (1.3 billion AUD) for 41 electric 6-car trains and two diesel 3-car trains. Alstom sucessfully delivers first C-Series train into
Alstom to Deliver 35 Additional RER NG Trains to Île-de-France Mobilités Yurtdışı Haberleri by railsistem - Nisan 10, 20240 Île-de-France Mobilités has contracted Alstom to supply an additional 35 RER NG trains for Line E, which spans between Paris and its eastern suburbs. This follows orders in 2017 and 2023 for 131 RER NG units for RER lines E and D, the first of which was inaugurated at the end
Switzerland: Alstom to Service 250 SBB IC2000 Rail Cars Yurtdışı Haberleri by railsistem - Nisan 5, 20240 Alstom has won a service contract to recondition 250 rail cars for Swiss Federal Railways (SBB). This order is valued at 62.7 million CHF (64.3 million EUR) and also provides an option to cover an additional 85 units. SBB’s IC2000 double-deck train © SBB Under this contract, Alstom will provide the anti-corrosion sanitation of
Alstom Delivers New T1 Tram to Île-de-France Yurtdışı Haberleri by railsistem - Nisan 4, 20240 Alstom has delivered the first new TW20 tram for the T1 tramway line in Île-de-France. The T1 tramway connects Asnières-sur-Seine to Noisy-le-Sec and will soon be served by new vehicles. The first of these has been delivered to the Villetaneuse depot from Alstom’s facility in La Rochelle. It is now scheduled to
Alstom to Fulfil X-Trafik Maintenance Contract with VR Sverige AB Yurtdışı Haberleri by railsistem - Mart 25, 20240 Alstom has been awarded a new maintenance contract for a set of nine X-trafik trains in the Gävleborg region of Sweden. The contract, which extends over eleven years, is set to include both operations and maintenance of the X-trafik units. Alstom’s workshop in Gävle will handle the maintenance of X-trafik’s trains © Alstom Work
Alstom Plans Open Access Rail Service in England and Wales Yurtdışı Haberleri by railsistem - Mart 14, 20240 Alstom and SLC Rail have partnered to deliver a new open access rail service between North Wales, Shropshire, the Midlands and London. This service will be known as Wrexham, Shropshire and Midlands Railway (WSMR). It will provide new direct connections to and from North Wales, Shropshire, the Midlands and London, with an
France: Alstom to Extend Le Mans Citadis Trams Yurtdışı Haberleri by railsistem - Mart 13, 20240 Alstom has been awarded a contract by Le Mans Métropole to extend the length of 34 Citadis trams in Le Mans, France. A 32-metre Citadis tram, which will be extended to 44 metres at the end of this project © Alstom Under this contract, which is valued at 57 million EUR, Alstom will
Alstom to Supply a Further 103 MF19 Metro Trains in Paris Yurtdışı Haberleri by railsistem - Mart 11, 20240 Alstom has received an order to supply an additional 103 MF19 new-generation metro trains for RATP in Paris, France. This order was placed on behalf of Île-de-France Mobilités and is worth over 800 million EUR. These new trains are 100% financed by Île-de-France Mobilités © Île-de-France Mobilités The new trains have been ordered under
Alstom to Supply 20 Additional Movia C30 Metro Trains for Stockholm Yurtdışı Haberleri by railsistem - Mart 7, 20240 Alstom has been contracted to supply an additional 20 Movia C30 metro trains for SL in Stockholm, Sweden. This agreement exercises an option from an existing contract, which was originally signed with Bombardier in 2013 and has since been extended. This contract included an initial order for 96 metro trains with an
Alstom Modernises 270 Metro Cars for Stockholm Yurtdışı Haberleri by railsistem - Mart 5, 20240 Alstom has successfully modernised 270 C20 cars for the Stockholm Metro in Sweden. This project has been ongoing since 2017 and is now concluding, with the last car leaving Alstom’s workshop in Västerås to return to Stockholm for enhanced passenger services. This project employed 110 fitters and 25 engineers, along with several
Alstom Commences Trainset Production for Delhi Metro Phase IV Yurtdışı Haberleri by railsistem - Şubat 26, 20240 Alstom has commenced production for an order of 52 six-car trainsets for the Delhi Metro Rail Corporation Phase IV. These modern Metropolis metro trainsets are being manufactured at Alstom’s facility in Sri City, India under a contract awarded in November 2022. The production was commenced at a commemorative ceremony led by leaders
India: Alstom Delivers First Trainset for Meerut Metro Project Yurtdışı Haberleri by railsistem - Şubat 21, 20240 Alstom has delivered the first trainset to the National Capital Region Transport Corporation (NCRTC) for the Meerut Metro project in India. This delivery is part of a 2020 contract for the supply of 210 cars for Meerut’s Regional Rapid Transit System (RRTS) and urban Mass Rapid Transit System (MRTS). The first trainset
Alstom Starts Production of Driverless Trainsets for Chennai Metro Phase II Yurtdışı Haberleri by railsistem - Şubat 8, 20240 India: Alstom has started the production of its Metropolis trainsets for the Chennai Metro Phase II at its manufacturing facility in Sricity. Alstom will deliver 36 three-car metro trainsets that have a maximum operating speed of 80km/h. The trains will run on the 26km corridor – a segment of Phase II
Alstom and Skanska Present Report on Oslo-Stockholm Railway Yurtdışı Haberleri by railsistem - Şubat 5, 20240 Alstom and Skanska have unveiled a new report presenting a proposed plan for a railway connection between Oslo and Stockholm. The ‘New Scandinavian Railway – Oslo-Stockholm’ report emphasises environmentally friendly and cost-effective methods to increase sustainability and minimise reliance on air travel between these major cities. The proposed railway connection also focuses on
Alstom to Deliver 16 Electric Locomotives to Romania Yurtdışı Haberleri by railsistem - Ocak 31, 20240 Alstom has signed a contract to supply 16 electric Traxx 3 MS locomotives with 20 years of maintenance to the Romanian Railway Reform Authority (ARF). This contract is valued at 150 million EUR and includes an option to extend the maintenance services for a further 20 years. This contract extends Alstom’s collaboration
Germany: DB Regio Orders High-Capacity EMUs from Alstom Yurtdışı Haberleri by railsistem - Ocak 24, 20240 Alstom has received an order to supply 18 modern Coradia Max electric multiple-unit (EMU) trains to DB Regio AG. This delivery will include nine three-car and nine five-car trains to operate on the regional express line RE1 between Hamburg and Rostock from December 2027. Once the line between Bad Kleinen and Lübeck
Alstom to Build Infrastructure for Florence Tramway Line 4 Yurtdışı Haberleri by railsistem - Ocak 15, 20240 The Municipality of Florence has selected Alstom to construct the Florence tramway Line 4 in Italy. This contract is valued at 50 million EUR and covers the tramway between Le Piagge station and Campi Bisenzio, which will serve 24 stops. Alstom will be responsible for the track, catenary, substations and lighting
Saudi Arabia: Alstom to Deliver AlUla’s Catenary-Free Tramway Yurtdışı Haberleri by railsistem - Ocak 4, 20240 Alstom has signed a contract with the Royal Commission for AlUla to deliver its battery-powered tramway line, which will be the world’s longest catenary-free line. This contract is valued at over 500 million EUR and will include the supply of 20 Citadis B battery trams, which Alstom will maintain using its
Alstom to Supply Coradia Stream H Hydrogen Trains in Italy Yurtdışı Haberleri by railsistem - Ocak 3, 20240 Alstom has announced that it will supply the first hydrogen trains to the region of Puglia, alongside a second order of hydrogen trains in Lombardy, Italy. Ferrovie del Sud Est (FSE) has ordered two Coradia Stream H hydrogen trains to replace current diesel units operating in Puglia. Meanwhile, Ferrovie Nord Milano (FNM),
Australia: Alstom Awarded Train Maintenance Contract in Victoria Yurtdışı Haberleri by railsistem - Ocak 2, 20240 Alstom has been awarded a contract to maintain the VLocity and Classic train fleets in Victoria, Australia for the next 10 years. The contract is valued at approximately 900 million EUR and will see Alstom deliver increased reliability and availability of the rolling stock, alongside significant fuel savings. This work will be
Alstom Secures Order for New Trams in Lille European Metropolitan Area Yurtdışı Haberleri by railsistem - Aralık 21, 20230 Alstom has announced it has been chosen to provide a new set of trams for two lines of the Lille tramway network. Supplying vehicles for both Line R and T, the initial order consists of 24 Citadis trams, with an option to add an additional 6 further down the line. Artist’s view