CDOT Announces Construction Date for New State/Lake Loop Elevated Station

The Chicago Department of Transportation (CDOT), in coordination with the Chicago Transit Authority (CTA), has announced that construction will begin on the new State/Lake Loop Elevated station in downtown Chicago.

Demolition of the 130-year-old station site is set to begin once it officially closes its doors on Monday 05 January 2026 – with construction on its replacement planned to begin shortly after.

An artist rendering of the new elevated stationAn artist rendering of the new elevated station

© CDOT

The new station will replace one of the oldest standing sites on the CTA rail system with an all-new, modern facility designed to improve safety, accessibility and comfort for passengers with wider platforms, new lifts for full ADA accessibility, a glass canopy and improved lighting & visibility.

It is currently scheduled to open in 2029.

During construction; all trains operating along the Brown, Green, Orange and Pink lines, as well as the Purple Line Express, will no longer stop at the State/Lake elevated station.

Loop trains will continue to operate, with riders urged to use the adjacent and fully accessible Washington/Wabash and Clark/Lake stations.

The Lake Red Line subway station will remain open. To transfer between the Lake Red Line subway station and the Loop Elevated rail lines, use the Washington/Wabash station.

Tags

Products & Services

source= https://railway-news.com/cdot-announces-construction-date-for-new-state-lake-loop-elevated-station/

Bir Cevap Yazın

Bu site istenmeyenleri azaltmak için Akismet kullanır. Yorum verilerinizin nasıl işlendiğini öğrenin.

Top