Germany: Aqseptence Group Rebuild Water Supply & Disposal Systems Yurtdışı Haberleri by railsistem - Eylül 10, 20190 Aqseptence Group was engaged to rebuild the largest railway service depot in Germany with its Roediger® water supply and disposal systems. The oldest and largest railway service depot of Deutsche Bahn AG was put into operation in Hamburg-Eidelstedt in 1991. At that time, the 8 elevated service tracks had already been equipped with Roediger® supply and disposal systems. As the depot infrastructure needed to be adapted and extended to serve the new generation of ICE 4 trains, the Aqseptence Group was engaged to rebuild and upgrade their wastewater disposal and water supply systems. The work will be done during ongoing maintenance operations and is scheduled to be completed by mid 2020. source= https://railway-news.com/aqseptence-group-rebuild-water-supply-and-disposal-systems/ Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail