No. 134 overhaul gathering pace at Inchicore works Yurtdışı Haberleri by railsistem - Mart 13, 20190 THE overhaul of the RPSI’s GM single cab Class 121 No. 134 by Iarnród Éireann-Irish Rail is making rapid progress at Inchicore, as the old body platework is stripped back in readiness for replacement. The RPSI’s project manager Gerry Mooney describes the overhaul as “the biggest diesel restoration ever undertaken in Ireland”, and it is clear to see why. The RPSI’s No. 134 sits in a semi-skeletal state in the Ramps facility at Inchicore on February 14. GERRY MOONEY Having totally rebuilt parts such as the bogies and traction motors, work has now turned to No. 134’s superstructure. The structural skeleton is being retained, but virtually all of the old platework is being renewed. The cab has already been pared back to the frame alone, and will see the centre window returned to its original as-built size. Read more in the March 2019 issue of The RM – on sale now! Enjoy more of The Railway Magazine reading every month. Click here to subscribe. Share this: Comments comments Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X Bluesky'da paylaş (Yeni pencerede açılır) Bluesky X'te paylaş (Yeni pencerede açılır) X Nextdoor'da paylaş (Yeni pencerede açılır) Nextdoor LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn Mastodon'da paylaş (Yeni pencerede açılır) Mastodon WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Threads'te paylaş (Yeni pencerede açılır) Threads Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail