Italian line reopens Yurtdışı Haberleri by railsistem - Mart 13, 20190 ITALY: Passenger services on the Ruvo – Corato section of Ferrotramviaria’s 70 km Bari – Barletta line restarted on March 4, having been suspended while the line was upgraded following a head-on collision on July 12 2016 in which 23 people were killed and 54 injured. The work has included 7·8 km of double-tracking, upgrading the signalling and building a bridge to replace a level crossing. Only one of the two tracks is initially being used, as the signalling system is not fully operational, with a shuttle service operating between Ruvo and Corato at a maximum speed of 50 km/h. An intermediate station Corato Bracco is expected to open in 2020. Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail