Stadler starts work on new factory Yurtdışı Haberleri by railsistem - Temmuz 4, 20180 SWITZERLAND: A groundbreaking ceremony launched construction of Stadler’s new assembly plant at St Margrethen in the northeast corner of Switzerland on July 4. The SFr86m facility will be used to assemble Kiss double-deck trainsets, replacing a former aircraft factory in nearby Altenrhein which is no longer suitable for the task. The 65 000 m2 rail-connected site in St Margrethen is owned by HIAG Immobilien, and the 35 000 m2 of production and warehousing space and 5 000 m2 of offices are being built by HRS. Stadler expects to move almost 1 000 staff from Altenrhein to the new plant from the end of 2019, although some processes employing between 50 and 70 staff will remain at the older site. Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X Bluesky'da paylaş (Yeni pencerede açılır) Bluesky X'te paylaş (Yeni pencerede açılır) X Nextdoor'da paylaş (Yeni pencerede açılır) Nextdoor LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn Mastodon'da paylaş (Yeni pencerede açılır) Mastodon WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Threads'te paylaş (Yeni pencerede açılır) Threads Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail