New test track opened at Long Marston

A new 3.5km electrified test track has been opened at Long Marston by rail minister Peter Hendy. Lord Hendy was joined by Porterbrook CEO Mary Grant. The rolling stock leasing company acquired the 56 hectare site at Long Marston, between Honeybourne and Stratford-upon-Avon, in 2021, and bought the freehold three years later.

Kaynak

Bir Cevap Yazın

Bu site istenmeyenleri azaltmak için Akismet kullanır. Yorum verilerinizin nasıl işlendiğini öğrenin.

Top