Zambia Railway Rehabilitation Project Yurtdışı Haberleri by railsistem - Mart 25, 20220 Within the scope of “Phase-1” works for “Zambia Railway Rehabilitation Project”, the visual and non-destructive inspection works of the bridges and culverts were carried out with our solution partners “TEC4” and “RENKLER İPLE ERISIM”. YAPIRAY Team working on the Zambia Railway Rehabilitation Project © YAPIRAY 27 pieces of bridges and 11 pieces of damaged culverts were examined in a basis of the structural evaluation and surveying was carried out. YAPIRAY Team working on the Zambia Railway Rehabilitation Project © YAPIRAY This article was originally published by YAPIRAY. source= https://railway-news.com/zambia-railway-rehabilitation-project/ İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail