Point machine built for winter on the steppe Yurtdışı Haberleri by railsistem - Temmuz 13, 20190 KAZAKHSTAN: In co-operation with national railway KTZ, the KazElektroPrivod equally-owned joint venture of Alstom and SOP Trade has completed a six-month test of a P80 point machine on a turnout designed by Prommashkomplekt and installed at Shiderty station. The locally-manufactured P80 has a design life of 20 years and is suitable for main lines, freight and metro use at speeds up to 180 km/h. The KTZ Ekibastuz signalling and communication department found no technical issues during the tests, which included 1 200 operations in winter temperatures as low as -40ºC. ‘We are very pleased that these field tests proved our point machines’ flexibility and adaptability to Kazakhstan’s environment and maintenance conditions, as well as demonstrated uninterrupted operation and absolute compatibility with the upgraded turnouts manufactured by our partner in Kazakhstan’, said Guillaume Tritter, Alstom Managing Director for Kazakhstan. source= https://www.railwaygazette.com/news/news/asia/single-view/view/point-machine-built-for-winter-on-the-steppe.html Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail