‘P2’ construction makes progress behind the scenes Yurtdışı Haberleri by railsistem - Temmuz 11, 20190 THINGS may appear to have gone quiet in Darlington, but the A1 Steam Locomotive Trust (A1SLT) continues to make what it described as “a lot of essential but relatively unspectacular” progress on the construction of new-build Gresley ‘P2’ 2-8-2 No. 2007 Prince of Wales. The £181,000 order for the Mikado’s motion was placed with Stephenson Engineering in Manchester last year, which includes the forging, machining and heat treatment of the coupling and connecting rods. The right-hand motion bracket in situ on June 21. DANIELA FILOVA The first of the intermediate coupling rods is expected to be delivered soon, and the trust has now received the first of the two outside motion brackets which, following inspection, has been fitted to the frames (see photo). Read more in the July 2019 issue of The RM – on sale now! Enjoy more of The Railway Magazine reading every month. Click here to subscribe. Share this: Comments comments source= https://www.railwaymagazine.co.uk/10985/p2-construction-makes-progress-behind-the-scenes/ Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail