A1 Trust orders TWO new boilers from DB Meiningen Yurtdışı Haberleri by railsistem - Temmuz 8, 20190 GERMAN steam locomotive works Dampflokwerk Meiningen has been awarded the contract to construct the new Diagram 118a boiler for new-build LNER ‘P2’ 2-8-2 No. 2007 Prince of Wales. The £1million order by the A1 Steam Locomotive Trust (A1SLT) covers not only the boiler for the Gresley Mikado, but also a second identical boiler for the trust’s flagship Peppercorn Pacific No. 60163 Tornado. The Diagram 118a boiler, built by DB Meiningen, is pictured during its construction in July 2006. DAVID ELLIOTT/A1SLT The Diagram 118a boiler is an updated version of the original LNER Diagram 118 boiler, modified to incorporate modern materials, welded construction and a steel firebox. This second batch of boilers will feature a number of modifications, which have either been fitted to Tornado’s current Meiningen-built boiler during its operational life, or planned improvements based on future usage with the ‘P2’. Read more in the July 2019 issue of The RM – on sale now! Enjoy more of The Railway Magazine reading every month. Click here to subscribe. Share this: Comments comments source= https://www.railwaymagazine.co.uk/10826/a1-trust-orders-two-new-boilers-from-db-meiningen/ Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail