£13m refurbishment for Glasgow Clyde bridge Yurtdışı Haberleri by railsistem - Mart 20, 20190 A TWO-YEAR, £13million renovation project is underway on one of Scotland’s busiest railway bridges. The 200 metre-long Clyde Bridge on the approach to Glasgow Central is used by up to 1,300 trains every day, serving the West Coast Main Line, Lanarkshire, Inverclyde and Ayrshire. The impressive Clyde bridge at Glasgow Central will be renovated over the next two years at a cost of £13million. NETWORK RAIL The Grade A-listed structure will undergo extensive refurbishment and repair works, with engineers blasting off old paint, inspecting and repairing the steel beneath, before repainting the bridge in its current colour scheme. ‘New Clyde Bridge’ was built between 1899-1905, as part of the Edwardian expansion of Glasgow Central, and is also known as the Caledonian Railway Bridge. Read more in the March 2019 issue of The RM – on sale now! Enjoy more of The Railway Magazine reading every month. Click here to subscribe. Share this: Comments comments Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail