First electric train reaches Jerusalem Yurtdışı Haberleri by railsistem - Temmuz 24, 20180 THE first electrically-hauled test train on Israel’s A1 Link between Tel Aviv and Jerusalem has travelled the full length of the 57km new line and reached Jerusalem Navon (formerly Hauma) station. This also marks the completion of electrification of one of the two tracks on the A1 Link. Some sections of track in the direction of Ben Gurion Airport and Tel Aviv still have to be electrified in time for the opening of the line on September 23. A journey time of 28 minutes is envisaged between Tel Aviv Hahagana and Jerusalem Navon, which is about 1 hour faster than using the existing service via the old line to Jerusalem Malha. Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X Bluesky'da paylaş (Yeni pencerede açılır) Bluesky X'te paylaş (Yeni pencerede açılır) X Nextdoor'da paylaş (Yeni pencerede açılır) Nextdoor LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn Mastodon'da paylaş (Yeni pencerede açılır) Mastodon WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Threads'te paylaş (Yeni pencerede açılır) Threads Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili