Preventing Catastrophic Rail Failures with Continuous Fleet-Based Track Monitoring Yurtdışı Haberleri by railsistem - Mayıs 19, 20260 Figure 5: Comparison across repeated train measurements (200m). Significant amplitude in D1 range (Circled in red), showing at the 1st February (left chart) and at next measurement (right chart). © Televic Rail From signal to decision Single peak → possible transient or vehicle effect Repeated geo-localized peak → infrastructure condition Increasing amplitude → degradation trend