Network Rail Trials Laser and Plasma Train to Blast Leaves Off the Line Yurtdışı Haberleri by railsistem - Ekim 26, 20220 Network Rail has announced that throughout October it has been performing comprehensive testing to determine whether laser beams and superheated plasma jets could be effective at clearing leaves off the line. The equipment has been fitted to Network Rail’s multi-purpose vehicles and has been deployed on heritage lines at the East
RAIB Publishes Interim Report on Salisbury Tunnel Junction Collision Yurtdışı Haberleri by railsistem - Şubat 21, 20220 The Rail Accident Investigation Branch (RAIB) has published its interim report into the collision between a GWR train and an SWR train at Salisbury Tunnel Junction that occurred on 31 October 2021. Weather Conditions On the day of the collision, there were strong winds and heavy rain in the Salisbury area. ~
Engineering Works at Salisbury to Check on Track Repairs Following October Collision Yurtdışı Haberleri by railsistem - Aralık 13, 20210 Engineering work will be taking place on the tracks near Salisbury station on Saturday, 18 December in order to finalise repairs to the damaged track following the collision between an SWR train and a GWR train outside Fisherton Tunnel in October. The track through the tunnel needed replacing after the collision,
Traffic through Salisbury Tunnel Junction to Reopen Tomorrow Following Collision Yurtdışı Haberleri by railsistem - Kasım 15, 20210 “I really appreciate how patient everyone has been with us over the past week and a half, from customers who have had their journeys disrupted, to our neighbours who have had cranes outside their houses, London Road closed for a period, and people working 24 hours a day to repair
RAIB: Wheel Slide Present at Salisbury Tunnel Junction Collision Yurtdışı Haberleri by railsistem - Kasım 3, 20210 “A team of RAIB inspectors arrived on site on Sunday evening and were joined yesterday by additional inspectors and our support team. We are working alongside partner organisations including the Office of Rail and Road (ORR) and BTP. Our investigation is progressing well. “Yesterday our focus was on evidence retrieval, we