US Transportation Secretary Announces $282.4 Million in Rail Work Grants Yurtdışı Haberleri by railsistem - Mayıs 9, 20250 US Transportation Secretary Sean P. Duffy has announced a series of 180 new infrastructure grants for projects across the country. The grants, which amount to more than 3.2 billion USD, will form part of a strategy to motion a portion of projects inherited from the previous government, with Secretary Duffy and
Transmission Dynamics Receives Prestigious King’s Award for Enterprise in Innovation for Rail Technology Yurtdışı Haberleri by railsistem - Mayıs 8, 20250 North East based engineering and innovation company Transmission Dynamics has been honoured with a King’s Award for Enterprise for Innovation, recognising the success and impact of its revolutionary rail infrastructure monitoring system, PANDAS-V. Deployed across the UK rail network and globally, PANDAS-V delivers real-time, proactive insights into the condition of overhead
UK: Isle of Wight Island Line Resumes Service Yurtdışı Haberleri by railsistem - Mayıs 2, 20250 Full service has resumed on the Isle of Wight’s Island Line after a nine-month programme of essential repairs have been carried out on Ryde Pier. The works, which were carried out by Octavius, were completed via the use of a tensioned access platform (TAP) – marking the first time the method
Complete Composite Systems (CCS) – ARCOSYSTEM Yurtdışı Haberleri by railsistem - Nisan 30, 20250 The rail industry’s leading elevated cable containment system – has reinforced its reputation for sustainability by gaining major environmental certification –ARCOSYSTEM. Complete Composite Systems (CCS) is delighted to announce that ARCOSYSTEM has officially achieved Environmental Product Declaration (EPD) verification. An EPD is a formal document that demonstrates a firm commitment to
Network Rail Issues Travel Advisories During May Engineering Works Yurtdışı Haberleri by railsistem - Nisan 29, 20250 Network Rail is encouraging passengers to check their journeys ahead of a number of works taking place across Britain’s railway network over both the early and late May bank holiday weekends. The works, which are valued at 133 million GBP, will see Network Rail undertaking over 630 projects across the country. Network
Trimble T4D Rail: Unlocking Rail Monitoring Success for Wayss & Freytag’s Weser Crossing Project Yurtdışı Haberleri by railsistem - Nisan 25, 20250 In this interview, the Trimble team sat down with Andreas Boldt, a surveying engineer at Wayss & Freytag Ingenieurbau AG, to discuss his role, the company’s focus and their experience with T4D Rail, an add-on module from Trimble 4D Control (T4D) monitoring software. Andreas shared his background, detailing his responsibilities in
UK: Network Rail Issues Travel Advice During Blackheath Tunnel Closure Yurtdışı Haberleri by railsistem - Nisan 25, 20250 Network Rail has outlined a temporary timetable for passengers looking to travel via the Blackheath tunnel between Sunday 18 May and Sunday 27 July 2025, as the tunnel is set to close for a period of 10 weeks. The closure, which will lead to a diversion via Greenwich, is due to
Asset Work Bank Planning for Signalling at Network Rail Yurtdışı Haberleri by railsistem - Nisan 11, 20250 Driving Efficiency: How Digital Platforms Are Revolutionising Work Bank Planning at Network Rail Rail BI is on a mission to revolutionise the way railway infrastructure managers handle complex data. By consolidating data sets from multiple sources into a single, coherent platform, the company enables sophisticated cost decision-making for rail infrastructure projects—taking
UK: Kettering to Wigston Electrification Receives ORR Authorisation Yurtdışı Haberleri by railsistem - Nisan 4, 20250 Journeys between Kettering and Wigston will soon be performed by electric trains following an official declaration that the line is ready and safe for their operation along the route, with the final decision officiated both on time and under budget. Certification was awarded by the Office of Rail and Road (ORR),
UK: KeolisAmey Signs New Eight Year DLR Contract Yurtdışı Haberleri by railsistem - Nisan 2, 20250 KeolisAmey has announced the continuation of its operation and maintenance for London’s DLR network with the signing of a new eight-year contract. The contract will also see the company, which has operated the DLR since 2014, introduce 54 new trains onto the system within the span of agreement. KeolisAmey has operated the
Poland: Alstom to Modernise Rail Traffic Control on Poznań Freight Bypass Yurtdışı Haberleri by railsistem - Nisan 1, 20250 Alstom has been chosen to deliver a slew of new rail traffic control systems for the Poznań freight bypass in Poland. The works, which will be carried out under a contract between Alstom and Krakowskie Zakłady Automatyki S.A., will see the installation of railway traffic control devices at both stations and