EviFile speeds Great Western electrification data capture Yurtdışı Haberleri by railsistem - Aralık 28, 20180 DATA CAPTURE: Contractor Balfour Beatty has been using a secure data collection platform from Leeds-based EviFile as part of its work to install 25 kV 50 Hz electrification between Bristol and Cardiff. The contractor deployed a customised version of eviFile’s digital progressive assurance methodology to replace a paper-based approach. This enabled it to speed up field data capture and the transmission of quality information to field engineers, managers and Network Rail. Thousands of paper records were replaced with automated electronic reports with a clear and tamper-proof audit trail. Completed inspection test plans are automatically uploaded to the electrification programme’s database, with dashboard reports provided on request along with detailed reports about individual areas, construction units and wire runs. ‘We see mobile site-based technologies as a key way to gather richer data, faster and more cost efficiently’, said Balfour Beatty Rail’s Director of Electrification Delivery, Peter Webb. ‘These marginal gains lead to significant efficiency savings, which our project with eviFile proves, as its use has enabled us to save seven figures in costs over a 12-month period.’ Paylaşmak Güzeldir... Facebook üzerinde paylaş (Yeni pencerede açılır) Facebook X'te paylaş (Yeni pencerede açılır) X LinkedIn'de paylaş (Yeni pencerede açılır) LinkedIn WhatsApp'ta paylaş (Yeni pencerede açılır) WhatsApp Pinterest'te paylaş (Yeni pencerede açılır) Pinterest Telegram'da paylaş (Yeni pencerede açılır) Telegram Reddit'te paylaş (Yeni pencerede açılır) Reddit Tumblr' da Paylaş (Yeni pencerede açılır) Tumblr Arkadaşınıza e-posta ile bağlantı gönderin (Yeni pencerede açılır) E-posta Daha fazla Yazdır (Yeni pencerede açılır) Yazdır Bunu beğen:Beğen Yükleniyor... İlgili Share on Facebook Share Share on TwitterTweet Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail