Coming up in the November issue of The RM: ScotRail’s first upgraded ‘Inter7City’ high-speed train enters service

By Tony Miles

ScotRail operated its first refurbished HST set in passenger service on October 15 as the 2+4 formation worked the 09.07 Aberdeen-Edinburgh.

The provisional first diagram is 09.07 Aberdeen-Edinburgh, 13.30 Edinburgh-Aberdeen,16.39 Dyce-Edinburgh and 21.43 Edinburgh-Aberdeen.

Ahead of the service debut ScotRail presented the refurbished HST to the press on October 10
with a special run between Aberdeen and Edinburgh.

Power car 43183 tails the 2+4 formation launch train for ScotRail’s ‘Inter7City’ HST sets at Aberdeen on October 10. ALL PICTURES: TONY MILES

Local media and stakeholders were extremely impressed with the quality of the refurbishment work, but the run was marred by technical problems with the leading power car – 43183 – which saw the train halted for more than 40 minutes south of Leuchars while the faults were rectified after a horn valve stuck open.

The refurbished trains will carry the ‘Inter7City’ branding as the sets will be used on services connecting Scotland’s seven cities: Aberdeen, Dundee, Edinburgh, Glasgow, Inverness, Perth and Stirling.

In addition to freeing up DMUs for use elsewhere, the HST sets will offer increased seating and luggage space on these flagship services, together with better on-board hospitality, ‘providing a boost for commuters, tourists, and business travellers’.

Read more and view more images in the November issue of The RM – on sale November 7!
Enjoy more of The Railway Magazine reading every month. Click here to subscribe.

Comments

comments

Bir Cevap Yazın

Bu site istenmeyenleri azaltmak için Akismet kullanır. Yorum verilerinizin nasıl işlendiğini öğrenin.

Top