HS2 Ltd Launches Public Consultation on Proposed Changes to Phase 2b

HS2 Ltd has launched a public consultation on the suggested design changes to be made to HS2 Phase 2b. The consultation will remain open until 11:45pm on 11 December 2020.

The proposed changes include more platforms at Manchester Piccadilly and Manchester Airport, a new rolling stock depot in Annandale, Scotland, and an additional rail connection between Crewe and the North. The measures are designed to improve the connection between HS2 and Northern Powerhouse Rail (NPR).

HS2 Phase 2b map
HS2 Phase 2b map

© HS2 Ltd

HS2 Ltd had launched the consultation taking into account the recommendation from the Oakervee Review, which said HS2 should be delivered in smaller chunks and thought should be given as to how the project could be delivered in tandem with other projects by creating an Integrated Rail Plan. The aim is to boost capacity and connectivity across the North and the Midlands.
source= https://railway-news.com/hs2-ltd-launches-public-consultation-on-proposed-changes-to-phase-2b/

Top
%d blogcu bunu beğendi: